A Modern, Column-Free Factory Built with SYS SM520 Steel for More Open Space and Greater Structural Strength

  • Siam Yamato Steel
  • Factory
  • A Modern, Column-Free Factory Built with SYS SM520 Steel for More Open Space and Greater Structural Strength

A Modern, Column-Free Factory Built with SYS SM520 Steel for More Open Space and Greater Structural Strength The modern, column-free factory of Process International Co., Ltd. (formerly Pharma Process Technology Co., Ltd.) uses SYS SM520 steel to create a more open, airy interior and a stronger structure. The factory was designed and built to support the production of hygienic process piping and utility systems, piping installation, and a range of projects for the brewing industry. From the earliest stages of design, Managing Director and project owner Mr. Peeradol Thongthawai oversaw the project with equal attention to aesthetics and structural quality. The factory reflects forward planning, with a structure designed to safely carry the loads expected during operation and a choice of H-beam steel based on confidence in its performance. SYS supported the project with a team of professional engineers, steel products that comply with Thai Industrial Standards (TIS), and prefabricated steel structure services. Its team provided design advice, prepared and fabricated the steel, and completed the installation of the required steel structure. The Process International Co., Ltd. factory is an example of how a customer’s requirements for a modern, column-free factory can be brought to life through design and installation by SYS’s team of specialists. From Choosing H-Beam Steel to Building a Strong, Visually Appealing Steel Warehouse with SYS Process International Co., Ltd. (formerly Pharma Process Technology Co., Ltd.), owned by Mr. Peeradol Thongthawai, specializes in high-quality metalworking. The factory has an open steel structure with a 20-meter clear span and crane rails mounted to the steel frame. The building is divided into two sections. The first is a 9-meter-high factory and warehouse area equipped with a runway for a 5-ton crane. The second is a two-story office with a simple, modern box-shaped façade. The project began with the decision to use steel for the building’s structure. The client was confident that steel would make construction easier to manage and offer the strength and design flexibility needed to meet all of the building’s functional requirements. The client therefore turned to SYS to design and build the structure using H-beam SM520 and SYS’s prefabricated steel structure services. The project used a bolt-and-nut installation system that reduced the need for on-site welding. Each component was prefabricated with bolt locations and connection points already in place for assembly. SYS designed every component, specifying its height, width, and cross-sectional dimensions as well as the appropriate bolt sizes so the steel structure would fit the site precisely. The bolted connections also allowed for accurate assembly, while factory fabrication made it possible to control welding quality and achieve better welds than with on-site welding. The bolt-and-nut system played a key role in helping Process International build quickly, maintain construction quality, and complete the project in time to enter the market. SM520 Steel and Prefabricated Steel Structures from SYS Products and Services That Help Shape the Space You Need SYS SM520-grade H-beam steel and SYS’s prefabricated steel structure services played a central role in creating the space the project owner envisioned. The SYS team provided design advice and adapted the prefabricated steel structure to suit the architectural drawings. SYS engineers also advised on how the structural design could accommodate additional requirements, such as increasing the clear span or installing additional crane rails. หลังจากคอนเฟิร์มแบบโครงสร้างร่วมกัน ทางทีม SYS ได้จัดเตรียมแบบ Shop Drawing และแปรรูปเหล็ก (Fabricate) พร้อมเข้าติดตั้งโครงสร้างเหล็กให้ที่หน้างานด้วยระบบ Bolt and Nut ที่แม่นยำตรงตามแบบ แทบไม่มีการตัดหรือแก้ไขชิ้นส่วนที่หน้างาน ทำให้ติดตั้งได้อย่างรวดเร็วง่ายดาย รอยต่อมีคุณภาพสวยงาม นอกจากนี้ยังเป็นระบบก่อสร้างแบบแห้ง (Dry Process) หน้างานจึงสะอาด ดูแลรักษาง่าย ช่วยให้สามารถทำงานส่วนอื่น ๆ อย่างผนัง Iso Wall ฟาซาดเมทัลชีท แผ่นหลังคาเป็นไปอย่างต่อเนื่องและรวดเร็วอีกด้วย ตลอดจนโครงสร้างสามารถรองรับการติดตั้ง Solar Cell ได้ในแผนถัดไป “Good Design Must Go Hand in Hand with Functionality and Strength” to Best Meet the Project’s Needs Mr. Peeradol Thongthawai noted that many factories and warehouses try to cut costs by sourcing steel elsewhere, for example by welding steel plates together to form structural members. The lower upfront price can come with more underlying problems. The resulting structure can be thin, prone to flexing, and appear unstable. Process International Co., Ltd. chose SYS SM520 to achieve a thicker, stronger building structure that meets Thai Industrial Standards (TIS). The structure can withstand wind loads and forces that may arise during an earthquake, giving the project owner confidence in its long-term performance. Mr. Peeradol Thongthawai considers aesthetics just as essential as structural strength. The Process International Co., Ltd. factory was therefore designed to feel open and modern, with neatly finished columns, beams, and roofing in a clean palette of gray and black. This design reflects the company’s identity as a manufacturer specializing in high-quality metalwork, with an emphasis on welding quality and hygiene in the systems it produces. The building’s appearance helps inspire confidence among those who use these systems. Prefabricated Steel Structures from SYS An Approachable Team, Expert Advice, and Fast, High-Quality Steelwork in Any Situation Reflecting on his experience working with SYS, Mr. Peeradol Thongthawai said he was impressed by the advice the team provided through its prefabricated steel structure service, from structural design to material selection. SYS recommended SM520-grade H-beam steel, which offered greater strength and load-bearing capacity with smaller cross-sections. This helped reduce the overall cost by approximately 20%. In Mr. Peeradol’s view, SM520-grade and SS400-grade H-beam steel were close in price. He considered the added performance of SM520 a worthwhile long-term investment.

A Modern, Column-Free Factory Built with SYS SM520 Steel for More Open Space and Greater Structural Strength

The modern, column-free factory of Process International Co., Ltd. (formerly Pharma Process Technology Co., Ltd.) uses SYS SM520 steel to create a more open, airy interior and a stronger structure. The factory was designed and built to support the production of hygienic process piping and utility systems, piping installation, and a range of projects for the brewing industry. From the earliest stages of design, Managing Director and project owner Mr. Peeradol Thongthawai oversaw the project with equal attention to aesthetics and structural quality.

The factory reflects forward planning, with a structure designed to safely carry the loads expected during operation and a choice of H-beam steel based on confidence in its performance. SYS supported the project with a team of professional engineers, steel products that comply with Thai Industrial Standards (TIS), and prefabricated steel structure services. Its team provided design advice, prepared and fabricated the steel, and completed the installation of the required steel structure.

The Process International Co., Ltd. factory is an example of how a customer’s requirements for a modern, column-free factory can be brought to life through design and installation by SYS’s team of specialists.

A Modern, Column-Free Factory Built with SYS SM520 Steel for More Open Space and Greater Structural Strength The modern, column-free factory of Process International Co., Ltd. (formerly Pharma Process Technology Co., Ltd.) uses SYS SM520 steel to create a more open, airy interior and a stronger structure. The factory was designed and built to support the production of hygienic process piping and utility systems, piping installation, and a range of projects for the brewing industry. From the earliest stages of design, Managing Director and project owner Mr. Peeradol Thongthawai oversaw the project with equal attention to aesthetics and structural quality. The factory reflects forward planning, with a structure designed to safely carry the loads expected during operation and a choice of H-beam steel based on confidence in its performance. SYS supported the project with a team of professional engineers, steel products that comply with Thai Industrial Standards (TIS), and prefabricated steel structure services. Its team provided design advice, prepared and fabricated the steel, and completed the installation of the required steel structure. The Process International Co., Ltd. factory is an example of how a customer’s requirements for a modern, column-free factory can be brought to life through design and installation by SYS’s team of specialists. From Choosing H-Beam Steel to Building a Strong, Visually Appealing Steel Warehouse with SYS Process International Co., Ltd. (formerly Pharma Process Technology Co., Ltd.), owned by Mr. Peeradol Thongthawai, specializes in high-quality metalworking. The factory has an open steel structure with a 20-meter clear span and crane rails mounted to the steel frame. The building is divided into two sections. The first is a 9-meter-high factory and warehouse area equipped with a runway for a 5-ton crane. The second is a two-story office with a simple, modern box-shaped façade. The project began with the decision to use steel for the building’s structure. The client was confident that steel would make construction easier to manage and offer the strength and design flexibility needed to meet all of the building’s functional requirements. The client therefore turned to SYS to design and build the structure using H-beam SM520 and SYS’s prefabricated steel structure services. The project used a bolt-and-nut installation system that reduced the need for on-site welding. Each component was prefabricated with bolt locations and connection points already in place for assembly. SYS designed every component, specifying its height, width, and cross-sectional dimensions as well as the appropriate bolt sizes so the steel structure would fit the site precisely. The bolted connections also allowed for accurate assembly, while factory fabrication made it possible to control welding quality and achieve better welds than with on-site welding. The bolt-and-nut system played a key role in helping Process International build quickly, maintain construction quality, and complete the project in time to enter the market. SM520 Steel and Prefabricated Steel Structures from SYS Products and Services That Help Shape the Space You Need SYS SM520-grade H-beam steel and SYS’s prefabricated steel structure services played a central role in creating the space the project owner envisioned. The SYS team provided design advice and adapted the prefabricated steel structure to suit the architectural drawings. SYS engineers also advised on how the structural design could accommodate additional requirements, such as increasing the clear span or installing additional crane rails. หลังจากคอนเฟิร์มแบบโครงสร้างร่วมกัน ทางทีม SYS ได้จัดเตรียมแบบ Shop Drawing และแปรรูปเหล็ก (Fabricate) พร้อมเข้าติดตั้งโครงสร้างเหล็กให้ที่หน้างานด้วยระบบ Bolt and Nut ที่แม่นยำตรงตามแบบ แทบไม่มีการตัดหรือแก้ไขชิ้นส่วนที่หน้างาน ทำให้ติดตั้งได้อย่างรวดเร็วง่ายดาย รอยต่อมีคุณภาพสวยงาม นอกจากนี้ยังเป็นระบบก่อสร้างแบบแห้ง (Dry Process) หน้างานจึงสะอาด ดูแลรักษาง่าย ช่วยให้สามารถทำงานส่วนอื่น ๆ อย่างผนัง Iso Wall ฟาซาดเมทัลชีท แผ่นหลังคาเป็นไปอย่างต่อเนื่องและรวดเร็วอีกด้วย ตลอดจนโครงสร้างสามารถรองรับการติดตั้ง Solar Cell ได้ในแผนถัดไป “Good Design Must Go Hand in Hand with Functionality and Strength” to Best Meet the Project’s Needs Mr. Peeradol Thongthawai noted that many factories and warehouses try to cut costs by sourcing steel elsewhere, for example by welding steel plates together to form structural members. The lower upfront price can come with more underlying problems. The resulting structure can be thin, prone to flexing, and appear unstable. Process International Co., Ltd. chose SYS SM520 to achieve a thicker, stronger building structure that meets Thai Industrial Standards (TIS). The structure can withstand wind loads and forces that may arise during an earthquake, giving the project owner confidence in its long-term performance. Mr. Peeradol Thongthawai considers aesthetics just as essential as structural strength. The Process International Co., Ltd. factory was therefore designed to feel open and modern, with neatly finished columns, beams, and roofing in a clean palette of gray and black. This design reflects the company’s identity as a manufacturer specializing in high-quality metalwork, with an emphasis on welding quality and hygiene in the systems it produces. The building’s appearance helps inspire confidence among those who use these systems. Prefabricated Steel Structures from SYS An Approachable Team, Expert Advice, and Fast, High-Quality Steelwork in Any Situation Reflecting on his experience working with SYS, Mr. Peeradol Thongthawai said he was impressed by the advice the team provided through its prefabricated steel structure service, from structural design to material selection. SYS recommended SM520-grade H-beam steel, which offered greater strength and load-bearing capacity with smaller cross-sections. This helped reduce the overall cost by approximately 20%. In Mr. Peeradol’s view, SM520-grade and SS400-grade H-beam steel were close in price. He considered the added performance of SM520 a worthwhile long-term investment.

From Choosing H-Beam Steel to Building a Strong, Visually Appealing Steel Warehouse with SYS

Process International Co., Ltd. (formerly Pharma Process Technology Co., Ltd.), owned by Mr. Peeradol Thongthawai, specializes in high-quality metalworking. The factory has an open steel structure with a 20-meter clear span and crane rails mounted to the steel frame. The building is divided into two sections. The first is a 9-meter-high factory and warehouse area equipped with a runway for a 5-ton crane. The second is a two-story office with a simple, modern box-shaped façade.

A Modern, Column-Free Factory Built with SYS SM520 Steel for More Open Space and Greater Structural Strength The modern, column-free factory of Process International Co., Ltd. (formerly Pharma Process Technology Co., Ltd.) uses SYS SM520 steel to create a more open, airy interior and a stronger structure. The factory was designed and built to support the production of hygienic process piping and utility systems, piping installation, and a range of projects for the brewing industry. From the earliest stages of design, Managing Director and project owner Mr. Peeradol Thongthawai oversaw the project with equal attention to aesthetics and structural quality. The factory reflects forward planning, with a structure designed to safely carry the loads expected during operation and a choice of H-beam steel based on confidence in its performance. SYS supported the project with a team of professional engineers, steel products that comply with Thai Industrial Standards (TIS), and prefabricated steel structure services. Its team provided design advice, prepared and fabricated the steel, and completed the installation of the required steel structure. The Process International Co., Ltd. factory is an example of how a customer’s requirements for a modern, column-free factory can be brought to life through design and installation by SYS’s team of specialists. From Choosing H-Beam Steel to Building a Strong, Visually Appealing Steel Warehouse with SYS Process International Co., Ltd. (formerly Pharma Process Technology Co., Ltd.), owned by Mr. Peeradol Thongthawai, specializes in high-quality metalworking. The factory has an open steel structure with a 20-meter clear span and crane rails mounted to the steel frame. The building is divided into two sections. The first is a 9-meter-high factory and warehouse area equipped with a runway for a 5-ton crane. The second is a two-story office with a simple, modern box-shaped façade. The project began with the decision to use steel for the building’s structure. The client was confident that steel would make construction easier to manage and offer the strength and design flexibility needed to meet all of the building’s functional requirements. The client therefore turned to SYS to design and build the structure using H-beam SM520 and SYS’s prefabricated steel structure services. The project used a bolt-and-nut installation system that reduced the need for on-site welding. Each component was prefabricated with bolt locations and connection points already in place for assembly. SYS designed every component, specifying its height, width, and cross-sectional dimensions as well as the appropriate bolt sizes so the steel structure would fit the site precisely. The bolted connections also allowed for accurate assembly, while factory fabrication made it possible to control welding quality and achieve better welds than with on-site welding. The bolt-and-nut system played a key role in helping Process International build quickly, maintain construction quality, and complete the project in time to enter the market. SM520 Steel and Prefabricated Steel Structures from SYS Products and Services That Help Shape the Space You Need SYS SM520-grade H-beam steel and SYS’s prefabricated steel structure services played a central role in creating the space the project owner envisioned. The SYS team provided design advice and adapted the prefabricated steel structure to suit the architectural drawings. SYS engineers also advised on how the structural design could accommodate additional requirements, such as increasing the clear span or installing additional crane rails. หลังจากคอนเฟิร์มแบบโครงสร้างร่วมกัน ทางทีม SYS ได้จัดเตรียมแบบ Shop Drawing และแปรรูปเหล็ก (Fabricate) พร้อมเข้าติดตั้งโครงสร้างเหล็กให้ที่หน้างานด้วยระบบ Bolt and Nut ที่แม่นยำตรงตามแบบ แทบไม่มีการตัดหรือแก้ไขชิ้นส่วนที่หน้างาน ทำให้ติดตั้งได้อย่างรวดเร็วง่ายดาย รอยต่อมีคุณภาพสวยงาม นอกจากนี้ยังเป็นระบบก่อสร้างแบบแห้ง (Dry Process) หน้างานจึงสะอาด ดูแลรักษาง่าย ช่วยให้สามารถทำงานส่วนอื่น ๆ อย่างผนัง Iso Wall ฟาซาดเมทัลชีท แผ่นหลังคาเป็นไปอย่างต่อเนื่องและรวดเร็วอีกด้วย ตลอดจนโครงสร้างสามารถรองรับการติดตั้ง Solar Cell ได้ในแผนถัดไป “Good Design Must Go Hand in Hand with Functionality and Strength” to Best Meet the Project’s Needs Mr. Peeradol Thongthawai noted that many factories and warehouses try to cut costs by sourcing steel elsewhere, for example by welding steel plates together to form structural members. The lower upfront price can come with more underlying problems. The resulting structure can be thin, prone to flexing, and appear unstable. Process International Co., Ltd. chose SYS SM520 to achieve a thicker, stronger building structure that meets Thai Industrial Standards (TIS). The structure can withstand wind loads and forces that may arise during an earthquake, giving the project owner confidence in its long-term performance. Mr. Peeradol Thongthawai considers aesthetics just as essential as structural strength. The Process International Co., Ltd. factory was therefore designed to feel open and modern, with neatly finished columns, beams, and roofing in a clean palette of gray and black. This design reflects the company’s identity as a manufacturer specializing in high-quality metalwork, with an emphasis on welding quality and hygiene in the systems it produces. The building’s appearance helps inspire confidence among those who use these systems. Prefabricated Steel Structures from SYS An Approachable Team, Expert Advice, and Fast, High-Quality Steelwork in Any Situation Reflecting on his experience working with SYS, Mr. Peeradol Thongthawai said he was impressed by the advice the team provided through its prefabricated steel structure service, from structural design to material selection. SYS recommended SM520-grade H-beam steel, which offered greater strength and load-bearing capacity with smaller cross-sections. This helped reduce the overall cost by approximately 20%. In Mr. Peeradol’s view, SM520-grade and SS400-grade H-beam steel were close in price. He considered the added performance of SM520 a worthwhile long-term investment.

The project began with the decision to use steel for the building’s structure. The client was confident that steel would make construction easier to manage and offer the strength and design flexibility needed to meet all of the building’s functional requirements. The client therefore turned to SYS to design and build the structure using H-beam SM520 and SYS’s prefabricated steel structure services.

A Modern, Column-Free Factory Built with SYS SM520 Steel for More Open Space and Greater Structural Strength The modern, column-free factory of Process International Co., Ltd. (formerly Pharma Process Technology Co., Ltd.) uses SYS SM520 steel to create a more open, airy interior and a stronger structure. The factory was designed and built to support the production of hygienic process piping and utility systems, piping installation, and a range of projects for the brewing industry. From the earliest stages of design, Managing Director and project owner Mr. Peeradol Thongthawai oversaw the project with equal attention to aesthetics and structural quality. The factory reflects forward planning, with a structure designed to safely carry the loads expected during operation and a choice of H-beam steel based on confidence in its performance. SYS supported the project with a team of professional engineers, steel products that comply with Thai Industrial Standards (TIS), and prefabricated steel structure services. Its team provided design advice, prepared and fabricated the steel, and completed the installation of the required steel structure. The Process International Co., Ltd. factory is an example of how a customer’s requirements for a modern, column-free factory can be brought to life through design and installation by SYS’s team of specialists. From Choosing H-Beam Steel to Building a Strong, Visually Appealing Steel Warehouse with SYS Process International Co., Ltd. (formerly Pharma Process Technology Co., Ltd.), owned by Mr. Peeradol Thongthawai, specializes in high-quality metalworking. The factory has an open steel structure with a 20-meter clear span and crane rails mounted to the steel frame. The building is divided into two sections. The first is a 9-meter-high factory and warehouse area equipped with a runway for a 5-ton crane. The second is a two-story office with a simple, modern box-shaped façade. The project began with the decision to use steel for the building’s structure. The client was confident that steel would make construction easier to manage and offer the strength and design flexibility needed to meet all of the building’s functional requirements. The client therefore turned to SYS to design and build the structure using H-beam SM520 and SYS’s prefabricated steel structure services. The project used a bolt-and-nut installation system that reduced the need for on-site welding. Each component was prefabricated with bolt locations and connection points already in place for assembly. SYS designed every component, specifying its height, width, and cross-sectional dimensions as well as the appropriate bolt sizes so the steel structure would fit the site precisely. The bolted connections also allowed for accurate assembly, while factory fabrication made it possible to control welding quality and achieve better welds than with on-site welding. The bolt-and-nut system played a key role in helping Process International build quickly, maintain construction quality, and complete the project in time to enter the market. SM520 Steel and Prefabricated Steel Structures from SYS Products and Services That Help Shape the Space You Need SYS SM520-grade H-beam steel and SYS’s prefabricated steel structure services played a central role in creating the space the project owner envisioned. The SYS team provided design advice and adapted the prefabricated steel structure to suit the architectural drawings. SYS engineers also advised on how the structural design could accommodate additional requirements, such as increasing the clear span or installing additional crane rails. หลังจากคอนเฟิร์มแบบโครงสร้างร่วมกัน ทางทีม SYS ได้จัดเตรียมแบบ Shop Drawing และแปรรูปเหล็ก (Fabricate) พร้อมเข้าติดตั้งโครงสร้างเหล็กให้ที่หน้างานด้วยระบบ Bolt and Nut ที่แม่นยำตรงตามแบบ แทบไม่มีการตัดหรือแก้ไขชิ้นส่วนที่หน้างาน ทำให้ติดตั้งได้อย่างรวดเร็วง่ายดาย รอยต่อมีคุณภาพสวยงาม นอกจากนี้ยังเป็นระบบก่อสร้างแบบแห้ง (Dry Process) หน้างานจึงสะอาด ดูแลรักษาง่าย ช่วยให้สามารถทำงานส่วนอื่น ๆ อย่างผนัง Iso Wall ฟาซาดเมทัลชีท แผ่นหลังคาเป็นไปอย่างต่อเนื่องและรวดเร็วอีกด้วย ตลอดจนโครงสร้างสามารถรองรับการติดตั้ง Solar Cell ได้ในแผนถัดไป “Good Design Must Go Hand in Hand with Functionality and Strength” to Best Meet the Project’s Needs Mr. Peeradol Thongthawai noted that many factories and warehouses try to cut costs by sourcing steel elsewhere, for example by welding steel plates together to form structural members. The lower upfront price can come with more underlying problems. The resulting structure can be thin, prone to flexing, and appear unstable. Process International Co., Ltd. chose SYS SM520 to achieve a thicker, stronger building structure that meets Thai Industrial Standards (TIS). The structure can withstand wind loads and forces that may arise during an earthquake, giving the project owner confidence in its long-term performance. Mr. Peeradol Thongthawai considers aesthetics just as essential as structural strength. The Process International Co., Ltd. factory was therefore designed to feel open and modern, with neatly finished columns, beams, and roofing in a clean palette of gray and black. This design reflects the company’s identity as a manufacturer specializing in high-quality metalwork, with an emphasis on welding quality and hygiene in the systems it produces. The building’s appearance helps inspire confidence among those who use these systems. Prefabricated Steel Structures from SYS An Approachable Team, Expert Advice, and Fast, High-Quality Steelwork in Any Situation Reflecting on his experience working with SYS, Mr. Peeradol Thongthawai said he was impressed by the advice the team provided through its prefabricated steel structure service, from structural design to material selection. SYS recommended SM520-grade H-beam steel, which offered greater strength and load-bearing capacity with smaller cross-sections. This helped reduce the overall cost by approximately 20%. In Mr. Peeradol’s view, SM520-grade and SS400-grade H-beam steel were close in price. He considered the added performance of SM520 a worthwhile long-term investment.

The project used a bolt-and-nut installation system that reduced the need for on-site welding. Each component was prefabricated with bolt locations and connection points already in place for assembly. SYS designed every component, specifying its height, width, and cross-sectional dimensions as well as the appropriate bolt sizes so the steel structure would fit the site precisely. The bolted connections also allowed for accurate assembly, while factory fabrication made it possible to control welding quality and achieve better welds than with on-site welding.

The bolt-and-nut system played a key role in helping Process International build quickly, maintain construction quality, and complete the project in time to enter the market.

A Modern, Column-Free Factory Built with SYS SM520 Steel for More Open Space and Greater Structural Strength The modern, column-free factory of Process International Co., Ltd. (formerly Pharma Process Technology Co., Ltd.) uses SYS SM520 steel to create a more open, airy interior and a stronger structure. The factory was designed and built to support the production of hygienic process piping and utility systems, piping installation, and a range of projects for the brewing industry. From the earliest stages of design, Managing Director and project owner Mr. Peeradol Thongthawai oversaw the project with equal attention to aesthetics and structural quality. The factory reflects forward planning, with a structure designed to safely carry the loads expected during operation and a choice of H-beam steel based on confidence in its performance. SYS supported the project with a team of professional engineers, steel products that comply with Thai Industrial Standards (TIS), and prefabricated steel structure services. Its team provided design advice, prepared and fabricated the steel, and completed the installation of the required steel structure. The Process International Co., Ltd. factory is an example of how a customer’s requirements for a modern, column-free factory can be brought to life through design and installation by SYS’s team of specialists. From Choosing H-Beam Steel to Building a Strong, Visually Appealing Steel Warehouse with SYS Process International Co., Ltd. (formerly Pharma Process Technology Co., Ltd.), owned by Mr. Peeradol Thongthawai, specializes in high-quality metalworking. The factory has an open steel structure with a 20-meter clear span and crane rails mounted to the steel frame. The building is divided into two sections. The first is a 9-meter-high factory and warehouse area equipped with a runway for a 5-ton crane. The second is a two-story office with a simple, modern box-shaped façade. The project began with the decision to use steel for the building’s structure. The client was confident that steel would make construction easier to manage and offer the strength and design flexibility needed to meet all of the building’s functional requirements. The client therefore turned to SYS to design and build the structure using H-beam SM520 and SYS’s prefabricated steel structure services. The project used a bolt-and-nut installation system that reduced the need for on-site welding. Each component was prefabricated with bolt locations and connection points already in place for assembly. SYS designed every component, specifying its height, width, and cross-sectional dimensions as well as the appropriate bolt sizes so the steel structure would fit the site precisely. The bolted connections also allowed for accurate assembly, while factory fabrication made it possible to control welding quality and achieve better welds than with on-site welding. The bolt-and-nut system played a key role in helping Process International build quickly, maintain construction quality, and complete the project in time to enter the market. SM520 Steel and Prefabricated Steel Structures from SYS Products and Services That Help Shape the Space You Need SYS SM520-grade H-beam steel and SYS’s prefabricated steel structure services played a central role in creating the space the project owner envisioned. The SYS team provided design advice and adapted the prefabricated steel structure to suit the architectural drawings. SYS engineers also advised on how the structural design could accommodate additional requirements, such as increasing the clear span or installing additional crane rails. หลังจากคอนเฟิร์มแบบโครงสร้างร่วมกัน ทางทีม SYS ได้จัดเตรียมแบบ Shop Drawing และแปรรูปเหล็ก (Fabricate) พร้อมเข้าติดตั้งโครงสร้างเหล็กให้ที่หน้างานด้วยระบบ Bolt and Nut ที่แม่นยำตรงตามแบบ แทบไม่มีการตัดหรือแก้ไขชิ้นส่วนที่หน้างาน ทำให้ติดตั้งได้อย่างรวดเร็วง่ายดาย รอยต่อมีคุณภาพสวยงาม นอกจากนี้ยังเป็นระบบก่อสร้างแบบแห้ง (Dry Process) หน้างานจึงสะอาด ดูแลรักษาง่าย ช่วยให้สามารถทำงานส่วนอื่น ๆ อย่างผนัง Iso Wall ฟาซาดเมทัลชีท แผ่นหลังคาเป็นไปอย่างต่อเนื่องและรวดเร็วอีกด้วย ตลอดจนโครงสร้างสามารถรองรับการติดตั้ง Solar Cell ได้ในแผนถัดไป “Good Design Must Go Hand in Hand with Functionality and Strength” to Best Meet the Project’s Needs Mr. Peeradol Thongthawai noted that many factories and warehouses try to cut costs by sourcing steel elsewhere, for example by welding steel plates together to form structural members. The lower upfront price can come with more underlying problems. The resulting structure can be thin, prone to flexing, and appear unstable. Process International Co., Ltd. chose SYS SM520 to achieve a thicker, stronger building structure that meets Thai Industrial Standards (TIS). The structure can withstand wind loads and forces that may arise during an earthquake, giving the project owner confidence in its long-term performance. Mr. Peeradol Thongthawai considers aesthetics just as essential as structural strength. The Process International Co., Ltd. factory was therefore designed to feel open and modern, with neatly finished columns, beams, and roofing in a clean palette of gray and black. This design reflects the company’s identity as a manufacturer specializing in high-quality metalwork, with an emphasis on welding quality and hygiene in the systems it produces. The building’s appearance helps inspire confidence among those who use these systems. Prefabricated Steel Structures from SYS An Approachable Team, Expert Advice, and Fast, High-Quality Steelwork in Any Situation Reflecting on his experience working with SYS, Mr. Peeradol Thongthawai said he was impressed by the advice the team provided through its prefabricated steel structure service, from structural design to material selection. SYS recommended SM520-grade H-beam steel, which offered greater strength and load-bearing capacity with smaller cross-sections. This helped reduce the overall cost by approximately 20%. In Mr. Peeradol’s view, SM520-grade and SS400-grade H-beam steel were close in price. He considered the added performance of SM520 a worthwhile long-term investment.

A Modern, Column-Free Factory Built with SYS SM520 Steel for More Open Space and Greater Structural Strength The modern, column-free factory of Process International Co., Ltd. (formerly Pharma Process Technology Co., Ltd.) uses SYS SM520 steel to create a more open, airy interior and a stronger structure. The factory was designed and built to support the production of hygienic process piping and utility systems, piping installation, and a range of projects for the brewing industry. From the earliest stages of design, Managing Director and project owner Mr. Peeradol Thongthawai oversaw the project with equal attention to aesthetics and structural quality. The factory reflects forward planning, with a structure designed to safely carry the loads expected during operation and a choice of H-beam steel based on confidence in its performance. SYS supported the project with a team of professional engineers, steel products that comply with Thai Industrial Standards (TIS), and prefabricated steel structure services. Its team provided design advice, prepared and fabricated the steel, and completed the installation of the required steel structure. The Process International Co., Ltd. factory is an example of how a customer’s requirements for a modern, column-free factory can be brought to life through design and installation by SYS’s team of specialists. From Choosing H-Beam Steel to Building a Strong, Visually Appealing Steel Warehouse with SYS Process International Co., Ltd. (formerly Pharma Process Technology Co., Ltd.), owned by Mr. Peeradol Thongthawai, specializes in high-quality metalworking. The factory has an open steel structure with a 20-meter clear span and crane rails mounted to the steel frame. The building is divided into two sections. The first is a 9-meter-high factory and warehouse area equipped with a runway for a 5-ton crane. The second is a two-story office with a simple, modern box-shaped façade. The project began with the decision to use steel for the building’s structure. The client was confident that steel would make construction easier to manage and offer the strength and design flexibility needed to meet all of the building’s functional requirements. The client therefore turned to SYS to design and build the structure using H-beam SM520 and SYS’s prefabricated steel structure services. The project used a bolt-and-nut installation system that reduced the need for on-site welding. Each component was prefabricated with bolt locations and connection points already in place for assembly. SYS designed every component, specifying its height, width, and cross-sectional dimensions as well as the appropriate bolt sizes so the steel structure would fit the site precisely. The bolted connections also allowed for accurate assembly, while factory fabrication made it possible to control welding quality and achieve better welds than with on-site welding. The bolt-and-nut system played a key role in helping Process International build quickly, maintain construction quality, and complete the project in time to enter the market. SM520 Steel and Prefabricated Steel Structures from SYS Products and Services That Help Shape the Space You Need SYS SM520-grade H-beam steel and SYS’s prefabricated steel structure services played a central role in creating the space the project owner envisioned. The SYS team provided design advice and adapted the prefabricated steel structure to suit the architectural drawings. SYS engineers also advised on how the structural design could accommodate additional requirements, such as increasing the clear span or installing additional crane rails. หลังจากคอนเฟิร์มแบบโครงสร้างร่วมกัน ทางทีม SYS ได้จัดเตรียมแบบ Shop Drawing และแปรรูปเหล็ก (Fabricate) พร้อมเข้าติดตั้งโครงสร้างเหล็กให้ที่หน้างานด้วยระบบ Bolt and Nut ที่แม่นยำตรงตามแบบ แทบไม่มีการตัดหรือแก้ไขชิ้นส่วนที่หน้างาน ทำให้ติดตั้งได้อย่างรวดเร็วง่ายดาย รอยต่อมีคุณภาพสวยงาม นอกจากนี้ยังเป็นระบบก่อสร้างแบบแห้ง (Dry Process) หน้างานจึงสะอาด ดูแลรักษาง่าย ช่วยให้สามารถทำงานส่วนอื่น ๆ อย่างผนัง Iso Wall ฟาซาดเมทัลชีท แผ่นหลังคาเป็นไปอย่างต่อเนื่องและรวดเร็วอีกด้วย ตลอดจนโครงสร้างสามารถรองรับการติดตั้ง Solar Cell ได้ในแผนถัดไป “Good Design Must Go Hand in Hand with Functionality and Strength” to Best Meet the Project’s Needs Mr. Peeradol Thongthawai noted that many factories and warehouses try to cut costs by sourcing steel elsewhere, for example by welding steel plates together to form structural members. The lower upfront price can come with more underlying problems. The resulting structure can be thin, prone to flexing, and appear unstable. Process International Co., Ltd. chose SYS SM520 to achieve a thicker, stronger building structure that meets Thai Industrial Standards (TIS). The structure can withstand wind loads and forces that may arise during an earthquake, giving the project owner confidence in its long-term performance. Mr. Peeradol Thongthawai considers aesthetics just as essential as structural strength. The Process International Co., Ltd. factory was therefore designed to feel open and modern, with neatly finished columns, beams, and roofing in a clean palette of gray and black. This design reflects the company’s identity as a manufacturer specializing in high-quality metalwork, with an emphasis on welding quality and hygiene in the systems it produces. The building’s appearance helps inspire confidence among those who use these systems. Prefabricated Steel Structures from SYS An Approachable Team, Expert Advice, and Fast, High-Quality Steelwork in Any Situation Reflecting on his experience working with SYS, Mr. Peeradol Thongthawai said he was impressed by the advice the team provided through its prefabricated steel structure service, from structural design to material selection. SYS recommended SM520-grade H-beam steel, which offered greater strength and load-bearing capacity with smaller cross-sections. This helped reduce the overall cost by approximately 20%. In Mr. Peeradol’s view, SM520-grade and SS400-grade H-beam steel were close in price. He considered the added performance of SM520 a worthwhile long-term investment.

A Modern, Column-Free Factory Built with SYS SM520 Steel for More Open Space and Greater Structural Strength The modern, column-free factory of Process International Co., Ltd. (formerly Pharma Process Technology Co., Ltd.) uses SYS SM520 steel to create a more open, airy interior and a stronger structure. The factory was designed and built to support the production of hygienic process piping and utility systems, piping installation, and a range of projects for the brewing industry. From the earliest stages of design, Managing Director and project owner Mr. Peeradol Thongthawai oversaw the project with equal attention to aesthetics and structural quality. The factory reflects forward planning, with a structure designed to safely carry the loads expected during operation and a choice of H-beam steel based on confidence in its performance. SYS supported the project with a team of professional engineers, steel products that comply with Thai Industrial Standards (TIS), and prefabricated steel structure services. Its team provided design advice, prepared and fabricated the steel, and completed the installation of the required steel structure. The Process International Co., Ltd. factory is an example of how a customer’s requirements for a modern, column-free factory can be brought to life through design and installation by SYS’s team of specialists. From Choosing H-Beam Steel to Building a Strong, Visually Appealing Steel Warehouse with SYS Process International Co., Ltd. (formerly Pharma Process Technology Co., Ltd.), owned by Mr. Peeradol Thongthawai, specializes in high-quality metalworking. The factory has an open steel structure with a 20-meter clear span and crane rails mounted to the steel frame. The building is divided into two sections. The first is a 9-meter-high factory and warehouse area equipped with a runway for a 5-ton crane. The second is a two-story office with a simple, modern box-shaped façade. The project began with the decision to use steel for the building’s structure. The client was confident that steel would make construction easier to manage and offer the strength and design flexibility needed to meet all of the building’s functional requirements. The client therefore turned to SYS to design and build the structure using H-beam SM520 and SYS’s prefabricated steel structure services. The project used a bolt-and-nut installation system that reduced the need for on-site welding. Each component was prefabricated with bolt locations and connection points already in place for assembly. SYS designed every component, specifying its height, width, and cross-sectional dimensions as well as the appropriate bolt sizes so the steel structure would fit the site precisely. The bolted connections also allowed for accurate assembly, while factory fabrication made it possible to control welding quality and achieve better welds than with on-site welding. The bolt-and-nut system played a key role in helping Process International build quickly, maintain construction quality, and complete the project in time to enter the market. SM520 Steel and Prefabricated Steel Structures from SYS Products and Services That Help Shape the Space You Need SYS SM520-grade H-beam steel and SYS’s prefabricated steel structure services played a central role in creating the space the project owner envisioned. The SYS team provided design advice and adapted the prefabricated steel structure to suit the architectural drawings. SYS engineers also advised on how the structural design could accommodate additional requirements, such as increasing the clear span or installing additional crane rails. หลังจากคอนเฟิร์มแบบโครงสร้างร่วมกัน ทางทีม SYS ได้จัดเตรียมแบบ Shop Drawing และแปรรูปเหล็ก (Fabricate) พร้อมเข้าติดตั้งโครงสร้างเหล็กให้ที่หน้างานด้วยระบบ Bolt and Nut ที่แม่นยำตรงตามแบบ แทบไม่มีการตัดหรือแก้ไขชิ้นส่วนที่หน้างาน ทำให้ติดตั้งได้อย่างรวดเร็วง่ายดาย รอยต่อมีคุณภาพสวยงาม นอกจากนี้ยังเป็นระบบก่อสร้างแบบแห้ง (Dry Process) หน้างานจึงสะอาด ดูแลรักษาง่าย ช่วยให้สามารถทำงานส่วนอื่น ๆ อย่างผนัง Iso Wall ฟาซาดเมทัลชีท แผ่นหลังคาเป็นไปอย่างต่อเนื่องและรวดเร็วอีกด้วย ตลอดจนโครงสร้างสามารถรองรับการติดตั้ง Solar Cell ได้ในแผนถัดไป “Good Design Must Go Hand in Hand with Functionality and Strength” to Best Meet the Project’s Needs Mr. Peeradol Thongthawai noted that many factories and warehouses try to cut costs by sourcing steel elsewhere, for example by welding steel plates together to form structural members. The lower upfront price can come with more underlying problems. The resulting structure can be thin, prone to flexing, and appear unstable. Process International Co., Ltd. chose SYS SM520 to achieve a thicker, stronger building structure that meets Thai Industrial Standards (TIS). The structure can withstand wind loads and forces that may arise during an earthquake, giving the project owner confidence in its long-term performance. Mr. Peeradol Thongthawai considers aesthetics just as essential as structural strength. The Process International Co., Ltd. factory was therefore designed to feel open and modern, with neatly finished columns, beams, and roofing in a clean palette of gray and black. This design reflects the company’s identity as a manufacturer specializing in high-quality metalwork, with an emphasis on welding quality and hygiene in the systems it produces. The building’s appearance helps inspire confidence among those who use these systems. Prefabricated Steel Structures from SYS An Approachable Team, Expert Advice, and Fast, High-Quality Steelwork in Any Situation Reflecting on his experience working with SYS, Mr. Peeradol Thongthawai said he was impressed by the advice the team provided through its prefabricated steel structure service, from structural design to material selection. SYS recommended SM520-grade H-beam steel, which offered greater strength and load-bearing capacity with smaller cross-sections. This helped reduce the overall cost by approximately 20%. In Mr. Peeradol’s view, SM520-grade and SS400-grade H-beam steel were close in price. He considered the added performance of SM520 a worthwhile long-term investment.

A Modern, Column-Free Factory Built with SYS SM520 Steel for More Open Space and Greater Structural Strength The modern, column-free factory of Process International Co., Ltd. (formerly Pharma Process Technology Co., Ltd.) uses SYS SM520 steel to create a more open, airy interior and a stronger structure. The factory was designed and built to support the production of hygienic process piping and utility systems, piping installation, and a range of projects for the brewing industry. From the earliest stages of design, Managing Director and project owner Mr. Peeradol Thongthawai oversaw the project with equal attention to aesthetics and structural quality. The factory reflects forward planning, with a structure designed to safely carry the loads expected during operation and a choice of H-beam steel based on confidence in its performance. SYS supported the project with a team of professional engineers, steel products that comply with Thai Industrial Standards (TIS), and prefabricated steel structure services. Its team provided design advice, prepared and fabricated the steel, and completed the installation of the required steel structure. The Process International Co., Ltd. factory is an example of how a customer’s requirements for a modern, column-free factory can be brought to life through design and installation by SYS’s team of specialists. From Choosing H-Beam Steel to Building a Strong, Visually Appealing Steel Warehouse with SYS Process International Co., Ltd. (formerly Pharma Process Technology Co., Ltd.), owned by Mr. Peeradol Thongthawai, specializes in high-quality metalworking. The factory has an open steel structure with a 20-meter clear span and crane rails mounted to the steel frame. The building is divided into two sections. The first is a 9-meter-high factory and warehouse area equipped with a runway for a 5-ton crane. The second is a two-story office with a simple, modern box-shaped façade. The project began with the decision to use steel for the building’s structure. The client was confident that steel would make construction easier to manage and offer the strength and design flexibility needed to meet all of the building’s functional requirements. The client therefore turned to SYS to design and build the structure using H-beam SM520 and SYS’s prefabricated steel structure services. The project used a bolt-and-nut installation system that reduced the need for on-site welding. Each component was prefabricated with bolt locations and connection points already in place for assembly. SYS designed every component, specifying its height, width, and cross-sectional dimensions as well as the appropriate bolt sizes so the steel structure would fit the site precisely. The bolted connections also allowed for accurate assembly, while factory fabrication made it possible to control welding quality and achieve better welds than with on-site welding. The bolt-and-nut system played a key role in helping Process International build quickly, maintain construction quality, and complete the project in time to enter the market. SM520 Steel and Prefabricated Steel Structures from SYS Products and Services That Help Shape the Space You Need SYS SM520-grade H-beam steel and SYS’s prefabricated steel structure services played a central role in creating the space the project owner envisioned. The SYS team provided design advice and adapted the prefabricated steel structure to suit the architectural drawings. SYS engineers also advised on how the structural design could accommodate additional requirements, such as increasing the clear span or installing additional crane rails. หลังจากคอนเฟิร์มแบบโครงสร้างร่วมกัน ทางทีม SYS ได้จัดเตรียมแบบ Shop Drawing และแปรรูปเหล็ก (Fabricate) พร้อมเข้าติดตั้งโครงสร้างเหล็กให้ที่หน้างานด้วยระบบ Bolt and Nut ที่แม่นยำตรงตามแบบ แทบไม่มีการตัดหรือแก้ไขชิ้นส่วนที่หน้างาน ทำให้ติดตั้งได้อย่างรวดเร็วง่ายดาย รอยต่อมีคุณภาพสวยงาม นอกจากนี้ยังเป็นระบบก่อสร้างแบบแห้ง (Dry Process) หน้างานจึงสะอาด ดูแลรักษาง่าย ช่วยให้สามารถทำงานส่วนอื่น ๆ อย่างผนัง Iso Wall ฟาซาดเมทัลชีท แผ่นหลังคาเป็นไปอย่างต่อเนื่องและรวดเร็วอีกด้วย ตลอดจนโครงสร้างสามารถรองรับการติดตั้ง Solar Cell ได้ในแผนถัดไป “Good Design Must Go Hand in Hand with Functionality and Strength” to Best Meet the Project’s Needs Mr. Peeradol Thongthawai noted that many factories and warehouses try to cut costs by sourcing steel elsewhere, for example by welding steel plates together to form structural members. The lower upfront price can come with more underlying problems. The resulting structure can be thin, prone to flexing, and appear unstable. Process International Co., Ltd. chose SYS SM520 to achieve a thicker, stronger building structure that meets Thai Industrial Standards (TIS). The structure can withstand wind loads and forces that may arise during an earthquake, giving the project owner confidence in its long-term performance. Mr. Peeradol Thongthawai considers aesthetics just as essential as structural strength. The Process International Co., Ltd. factory was therefore designed to feel open and modern, with neatly finished columns, beams, and roofing in a clean palette of gray and black. This design reflects the company’s identity as a manufacturer specializing in high-quality metalwork, with an emphasis on welding quality and hygiene in the systems it produces. The building’s appearance helps inspire confidence among those who use these systems. Prefabricated Steel Structures from SYS An Approachable Team, Expert Advice, and Fast, High-Quality Steelwork in Any Situation Reflecting on his experience working with SYS, Mr. Peeradol Thongthawai said he was impressed by the advice the team provided through its prefabricated steel structure service, from structural design to material selection. SYS recommended SM520-grade H-beam steel, which offered greater strength and load-bearing capacity with smaller cross-sections. This helped reduce the overall cost by approximately 20%. In Mr. Peeradol’s view, SM520-grade and SS400-grade H-beam steel were close in price. He considered the added performance of SM520 a worthwhile long-term investment.

SM520 Steel and Prefabricated Steel Structures from SYS

Products and Services That Help Shape the Space You Need

SYS SM520-grade H-beam steel and SYS’s prefabricated steel structure services played a central role in creating the space the project owner envisioned. The SYS team provided design advice and adapted the prefabricated steel structure to suit the architectural drawings. SYS engineers also advised on how the structural design could accommodate additional requirements, such as increasing the clear span or installing additional crane rails.

A Modern, Column-Free Factory Built with SYS SM520 Steel for More Open Space and Greater Structural Strength The modern, column-free factory of Process International Co., Ltd. (formerly Pharma Process Technology Co., Ltd.) uses SYS SM520 steel to create a more open, airy interior and a stronger structure. The factory was designed and built to support the production of hygienic process piping and utility systems, piping installation, and a range of projects for the brewing industry. From the earliest stages of design, Managing Director and project owner Mr. Peeradol Thongthawai oversaw the project with equal attention to aesthetics and structural quality. The factory reflects forward planning, with a structure designed to safely carry the loads expected during operation and a choice of H-beam steel based on confidence in its performance. SYS supported the project with a team of professional engineers, steel products that comply with Thai Industrial Standards (TIS), and prefabricated steel structure services. Its team provided design advice, prepared and fabricated the steel, and completed the installation of the required steel structure. The Process International Co., Ltd. factory is an example of how a customer’s requirements for a modern, column-free factory can be brought to life through design and installation by SYS’s team of specialists. From Choosing H-Beam Steel to Building a Strong, Visually Appealing Steel Warehouse with SYS Process International Co., Ltd. (formerly Pharma Process Technology Co., Ltd.), owned by Mr. Peeradol Thongthawai, specializes in high-quality metalworking. The factory has an open steel structure with a 20-meter clear span and crane rails mounted to the steel frame. The building is divided into two sections. The first is a 9-meter-high factory and warehouse area equipped with a runway for a 5-ton crane. The second is a two-story office with a simple, modern box-shaped façade. The project began with the decision to use steel for the building’s structure. The client was confident that steel would make construction easier to manage and offer the strength and design flexibility needed to meet all of the building’s functional requirements. The client therefore turned to SYS to design and build the structure using H-beam SM520 and SYS’s prefabricated steel structure services. The project used a bolt-and-nut installation system that reduced the need for on-site welding. Each component was prefabricated with bolt locations and connection points already in place for assembly. SYS designed every component, specifying its height, width, and cross-sectional dimensions as well as the appropriate bolt sizes so the steel structure would fit the site precisely. The bolted connections also allowed for accurate assembly, while factory fabrication made it possible to control welding quality and achieve better welds than with on-site welding. The bolt-and-nut system played a key role in helping Process International build quickly, maintain construction quality, and complete the project in time to enter the market. SM520 Steel and Prefabricated Steel Structures from SYS Products and Services That Help Shape the Space You Need SYS SM520-grade H-beam steel and SYS’s prefabricated steel structure services played a central role in creating the space the project owner envisioned. The SYS team provided design advice and adapted the prefabricated steel structure to suit the architectural drawings. SYS engineers also advised on how the structural design could accommodate additional requirements, such as increasing the clear span or installing additional crane rails. หลังจากคอนเฟิร์มแบบโครงสร้างร่วมกัน ทางทีม SYS ได้จัดเตรียมแบบ Shop Drawing และแปรรูปเหล็ก (Fabricate) พร้อมเข้าติดตั้งโครงสร้างเหล็กให้ที่หน้างานด้วยระบบ Bolt and Nut ที่แม่นยำตรงตามแบบ แทบไม่มีการตัดหรือแก้ไขชิ้นส่วนที่หน้างาน ทำให้ติดตั้งได้อย่างรวดเร็วง่ายดาย รอยต่อมีคุณภาพสวยงาม นอกจากนี้ยังเป็นระบบก่อสร้างแบบแห้ง (Dry Process) หน้างานจึงสะอาด ดูแลรักษาง่าย ช่วยให้สามารถทำงานส่วนอื่น ๆ อย่างผนัง Iso Wall ฟาซาดเมทัลชีท แผ่นหลังคาเป็นไปอย่างต่อเนื่องและรวดเร็วอีกด้วย ตลอดจนโครงสร้างสามารถรองรับการติดตั้ง Solar Cell ได้ในแผนถัดไป “Good Design Must Go Hand in Hand with Functionality and Strength” to Best Meet the Project’s Needs Mr. Peeradol Thongthawai noted that many factories and warehouses try to cut costs by sourcing steel elsewhere, for example by welding steel plates together to form structural members. The lower upfront price can come with more underlying problems. The resulting structure can be thin, prone to flexing, and appear unstable. Process International Co., Ltd. chose SYS SM520 to achieve a thicker, stronger building structure that meets Thai Industrial Standards (TIS). The structure can withstand wind loads and forces that may arise during an earthquake, giving the project owner confidence in its long-term performance. Mr. Peeradol Thongthawai considers aesthetics just as essential as structural strength. The Process International Co., Ltd. factory was therefore designed to feel open and modern, with neatly finished columns, beams, and roofing in a clean palette of gray and black. This design reflects the company’s identity as a manufacturer specializing in high-quality metalwork, with an emphasis on welding quality and hygiene in the systems it produces. The building’s appearance helps inspire confidence among those who use these systems. Prefabricated Steel Structures from SYS An Approachable Team, Expert Advice, and Fast, High-Quality Steelwork in Any Situation Reflecting on his experience working with SYS, Mr. Peeradol Thongthawai said he was impressed by the advice the team provided through its prefabricated steel structure service, from structural design to material selection. SYS recommended SM520-grade H-beam steel, which offered greater strength and load-bearing capacity with smaller cross-sections. This helped reduce the overall cost by approximately 20%. In Mr. Peeradol’s view, SM520-grade and SS400-grade H-beam steel were close in price. He considered the added performance of SM520 a worthwhile long-term investment.
A Modern, Column-Free Factory Built with SYS SM520 Steel for More Open Space and Greater Structural Strength The modern, column-free factory of Process International Co., Ltd. (formerly Pharma Process Technology Co., Ltd.) uses SYS SM520 steel to create a more open, airy interior and a stronger structure. The factory was designed and built to support the production of hygienic process piping and utility systems, piping installation, and a range of projects for the brewing industry. From the earliest stages of design, Managing Director and project owner Mr. Peeradol Thongthawai oversaw the project with equal attention to aesthetics and structural quality. The factory reflects forward planning, with a structure designed to safely carry the loads expected during operation and a choice of H-beam steel based on confidence in its performance. SYS supported the project with a team of professional engineers, steel products that comply with Thai Industrial Standards (TIS), and prefabricated steel structure services. Its team provided design advice, prepared and fabricated the steel, and completed the installation of the required steel structure. The Process International Co., Ltd. factory is an example of how a customer’s requirements for a modern, column-free factory can be brought to life through design and installation by SYS’s team of specialists. From Choosing H-Beam Steel to Building a Strong, Visually Appealing Steel Warehouse with SYS Process International Co., Ltd. (formerly Pharma Process Technology Co., Ltd.), owned by Mr. Peeradol Thongthawai, specializes in high-quality metalworking. The factory has an open steel structure with a 20-meter clear span and crane rails mounted to the steel frame. The building is divided into two sections. The first is a 9-meter-high factory and warehouse area equipped with a runway for a 5-ton crane. The second is a two-story office with a simple, modern box-shaped façade. The project began with the decision to use steel for the building’s structure. The client was confident that steel would make construction easier to manage and offer the strength and design flexibility needed to meet all of the building’s functional requirements. The client therefore turned to SYS to design and build the structure using H-beam SM520 and SYS’s prefabricated steel structure services. The project used a bolt-and-nut installation system that reduced the need for on-site welding. Each component was prefabricated with bolt locations and connection points already in place for assembly. SYS designed every component, specifying its height, width, and cross-sectional dimensions as well as the appropriate bolt sizes so the steel structure would fit the site precisely. The bolted connections also allowed for accurate assembly, while factory fabrication made it possible to control welding quality and achieve better welds than with on-site welding. The bolt-and-nut system played a key role in helping Process International build quickly, maintain construction quality, and complete the project in time to enter the market. SM520 Steel and Prefabricated Steel Structures from SYS Products and Services That Help Shape the Space You Need SYS SM520-grade H-beam steel and SYS’s prefabricated steel structure services played a central role in creating the space the project owner envisioned. The SYS team provided design advice and adapted the prefabricated steel structure to suit the architectural drawings. SYS engineers also advised on how the structural design could accommodate additional requirements, such as increasing the clear span or installing additional crane rails. หลังจากคอนเฟิร์มแบบโครงสร้างร่วมกัน ทางทีม SYS ได้จัดเตรียมแบบ Shop Drawing และแปรรูปเหล็ก (Fabricate) พร้อมเข้าติดตั้งโครงสร้างเหล็กให้ที่หน้างานด้วยระบบ Bolt and Nut ที่แม่นยำตรงตามแบบ แทบไม่มีการตัดหรือแก้ไขชิ้นส่วนที่หน้างาน ทำให้ติดตั้งได้อย่างรวดเร็วง่ายดาย รอยต่อมีคุณภาพสวยงาม นอกจากนี้ยังเป็นระบบก่อสร้างแบบแห้ง (Dry Process) หน้างานจึงสะอาด ดูแลรักษาง่าย ช่วยให้สามารถทำงานส่วนอื่น ๆ อย่างผนัง Iso Wall ฟาซาดเมทัลชีท แผ่นหลังคาเป็นไปอย่างต่อเนื่องและรวดเร็วอีกด้วย ตลอดจนโครงสร้างสามารถรองรับการติดตั้ง Solar Cell ได้ในแผนถัดไป “Good Design Must Go Hand in Hand with Functionality and Strength” to Best Meet the Project’s Needs Mr. Peeradol Thongthawai noted that many factories and warehouses try to cut costs by sourcing steel elsewhere, for example by welding steel plates together to form structural members. The lower upfront price can come with more underlying problems. The resulting structure can be thin, prone to flexing, and appear unstable. Process International Co., Ltd. chose SYS SM520 to achieve a thicker, stronger building structure that meets Thai Industrial Standards (TIS). The structure can withstand wind loads and forces that may arise during an earthquake, giving the project owner confidence in its long-term performance. Mr. Peeradol Thongthawai considers aesthetics just as essential as structural strength. The Process International Co., Ltd. factory was therefore designed to feel open and modern, with neatly finished columns, beams, and roofing in a clean palette of gray and black. This design reflects the company’s identity as a manufacturer specializing in high-quality metalwork, with an emphasis on welding quality and hygiene in the systems it produces. The building’s appearance helps inspire confidence among those who use these systems. Prefabricated Steel Structures from SYS An Approachable Team, Expert Advice, and Fast, High-Quality Steelwork in Any Situation Reflecting on his experience working with SYS, Mr. Peeradol Thongthawai said he was impressed by the advice the team provided through its prefabricated steel structure service, from structural design to material selection. SYS recommended SM520-grade H-beam steel, which offered greater strength and load-bearing capacity with smaller cross-sections. This helped reduce the overall cost by approximately 20%. In Mr. Peeradol’s view, SM520-grade and SS400-grade H-beam steel were close in price. He considered the added performance of SM520 a worthwhile long-term investment.

โรงงานยุคใหม่ กับดีไซน์โมเดิร์น ไร้เสากลาง ที่โปร่งโล่งและแกร่งกว่าเดิมด้วยเหล็ก SYS SM520 โรงงานยุคใหม่ ดีไซน์โมเดิร์น ไร้เสากลาง บริษัท โปรเซส อินเตอร์เนชั่นแนล จำกัด (ชื่อเดิม บริษัท ฟาร์ม่า โปรเซส เทคโนโลยี จำกัด) ถูกออกแบบและก่อสร้างเพื่อเป็นพื้นที่ผลิต Process Hygienic Piping, Utilities Systems, Piping Installation ตลอดจน Brewery Industry ต่าง ๆ ที่อยู่ภายใต้การดูแลของ “คุณภีรดลย์ ทองทะไว” ผู้เป็น Managing Director เเละเจ้าของโครงการที่ใส่ใจทั้งดีไซน์ที่สวยงามและคุณภาพของโครงสร้างควบคู่กันตั้งแต่ก้าวแรกของการออกแบบ โครงการนี้จึงไม่ใช่แค่สิ่งก่อสร้าง แต่คือผลลัพธ์ที่เกิดขึ้นจากการมองการณ์ไกลที่คิดเผื่อการรับน้ำหนักจากการใช้งานที่ปลอดภัยและมั่นใจศักยภาพของเหล็ก H-BEAM ที่มีทั้งทีมงานวิศวกรมืออาชีพ สินค้าเหล็กได้มาตรฐาน มอก. และบริการโครงสร้างเหล็กสำเร็จรูปจาก SYS ที่เข้ามาช่วยให้คำปรึกษาตั้งแต่ออกแบบ จัดเตรียม และแปรรูปเหล็ก พร้อมทั้งติดตั้งโครงสร้างเหล็กที่ต้องการให้เสร็จสรรพ บริษัท โปรเซส อินเตอร์เนชั่นแนล จำกัด จึงเป็นตัวอย่างของการก่อสร้าง โรงงานยุคใหม่ ดีไซน์โมเดิร์น ไร้เสากลาง ที่เกิดขึ้นจากความต้องการของลูกค้า และถูกก่อสร้างให้เป็นจริงผ่านการออกแบบติดตั้งจากทีมผู้เชี่ยวชาญของ SYS จากความตั้งใจเลือกใช้เหล็ก H-BEAM สู่โครงสร้างโกดังเหล็กที่สวยและแข็งแรงโดยทีมงาน SYS บริษัท โปรเซส อินเตอร์เนชั่นแนล จำกัด (ชื่อเดิม บริษัท ฟาร์ม่า โปรเซส  เทคโนโลยี จำกัด) เป็นบริษัทผู้เชี่ยวชาญด้านงานโลหการคุณภาพสูงของ “คุณภีรดลย์ ทองทะไว” โดยโรงงานมีลักษณะเป็นโครงสร้างเหล็ก โปร่งโล่ง Span กว้าง 20 ม. และมีการติดตั้งรางเครนไว้กับโครงสร้าง อาคาร 1 หลังแบ่งฟังก์ชันเป็น 2 ส่วน คือ โรงงานโกดังที่มีความสูง 9 ม. มีการติดตั้งรางเครนหนัก 5 ตัน และออฟฟิศ 2 ชั้นโดยดีไซน์ฟาซาดเป็นรูปทรงกล่อง ดูเรียบง่ายและทันสมัย จุดเริ่มต้นมาจากความต้องการใช้เหล็กเป็นโครงสร้างของอาคาร เพราะมั่นใจในการจัดการการก่อสร้าง ความแข็งแรง และดีไซน์ของเหล็กที่ตอบโจทย์การใช้งานได้ครบทุกด้าน จึงติดต่อทีมงาน SYS ในการออกแบบและดำเนินการผ่านการใช้เหล็ก H-BEAM เกรด SM520 และบริการโครงสร้างเหล็กสำเร็จรูปจาก SYS ลดการตัด – ต่อ – เชื่อม หน้างาน ลด Error เพิ่มความแม่นยำ – คำตอบของการก่อสร้างยุคใหม่ ในโครงการนี้มีการติดตั้งด้วยระบบติดตั้ง Bolt and Nut ซึ่งช่วยลดการเชื่อมที่หน้างาน เพราะชิ้นส่วนถูกวางตำแหน่งน็อตและจุดขันประกอบมาเรียบร้อยแล้ว โดยระหว่างขั้นตอน ทาง SYS ได้ช่วยดีไซน์ทุกชิ้นส่วน ตั้งแต่ความสูง ความกว้าง ขนาดหน้าตัด ตลอดจนรายละเอียดขนาดน็อตที่ใช้อย่างลงตัว ทำให้โครงสร้างเหล็กพอดีกับขนาดที่ดิน อีกทั้งระบบ Bolt and Nut ยังติดตั้งได้แม่นยำถูกต้อง และรอยเชื่อมมีคุณภาพมากกว่าการเชื่อมที่หน้างาน เพราะมีการ Fabricate เหล็กมาจากโรงงานทำให้สามารถควบคุมคุณภาพได้ เรียกได้ว่าการติดตั้งแบบ Bolt and Nut เป็นหัวใจสำคัญที่ทำให้ Process International ก่อสร้างได้รวดเร็ว คุณภาพดี จบงานได้ไว เพื่อให้พร้อมเข้าสู่ตลาดธุรกิจได้ทันท่วงที SM520 และโครงสร้างเหล็กสำเร็จรูปจาก SYS สินค้า – บริการที่ช่วยสร้าง Space ได้ตามต้องการ ทั้งเหล็ก SYS H-BEAM เกรด SM520 และบริการโครงสร้างเหล็กสำเร็จรูปจาก SYS ทำหน้าที่หลักในการสร้างสรรค์ Space ที่เจ้าของโครงการต้องการเกิดขึ้นได้จริง ด้วยการมีทีมงานของ SYS คอยให้คำปรึกษาเรื่องดีไซน์ มีโครงสร้างสำเร็จรูปที่สามารถประยุกต์จากแบบสถาปัตย์ และวิศวกรของ SYS ช่วยให้คำปรึกษาเรื่องแบบโครงสร้างให้เข้ากับความต้องการเพิ่มเติมได้ เช่น การขยาย Span ให้กว้างขึ้น หรือติดตั้งรางเครนเพิ่มเติม หลังจากคอนเฟิร์มแบบโครงสร้างร่วมกัน ทางทีม SYS ได้จัดเตรียมแบบ Shop Drawing และแปรรูปเหล็ก (Fabricate) พร้อมเข้าติดตั้งโครงสร้างเหล็กให้ที่หน้างานด้วยระบบ Bolt and Nut ที่แม่นยำตรงตามแบบ แทบไม่มีการตัดหรือแก้ไขชิ้นส่วนที่หน้างาน ทำให้ติดตั้งได้อย่างรวดเร็วง่ายดาย รอยต่อมีคุณภาพสวยงาม นอกจากนี้ยังเป็นระบบก่อสร้างแบบแห้ง (Dry Process) หน้างานจึงสะอาด ดูแลรักษาง่าย ช่วยให้สามารถทำงานส่วนอื่น ๆ อย่างผนัง Iso Wall ฟาซาดเมทัลชีท แผ่นหลังคาเป็นไปอย่างต่อเนื่องและรวดเร็วอีกด้วย ตลอดจนโครงสร้างสามารถรองรับการติดตั้ง Solar Cell ได้ในแผนถัดไป “ความสวยงามต้องไปพร้อมฟังก์ชันและความแข็งแรง” จึงจะตอบโจทย์ได้ดีที่สุด โดยคุณภีรดลย์ยังได้แลกเปลี่ยนว่า มีโรงงานและโกดังหลายแห่งต้องการประหยัดงบประมาณโดยเลือกใช้เหล็กจากแหล่งอื่น เช่น ใช้เหล็กแผ่นมาต่อเชื่อมเป็นโครงสร้าง ที่แม้ราคาสินค้าจะถูก แต่ปัญหาแฝงในภาพรวมนั้นมีมากกว่า อีกทั้งโครงสร้างที่ได้ยังมีความพลิ้ว บาง และดูไม่มั่นคง แต่สำหรับ บริษัท โปรเซส อินเตอร์เนชั่นแนล จำกัด ตัดสินใจเลือกใช้เหล็ก SYS เกรด SM520 ทำให้โครงสร้างอาคารมีความหนา แข็งแรงได้มาตรฐานตาม มอก. กำหนด จึงทนทานต่อแรงลมเเละแรงที่อาจเกิดขึ้นจากแผ่นดินไหวได้ หมดกังวลว่าจะเกิดปัญหาในอนาคต นอกจากด้านความแข็งแรงที่ต้องให้ความสำคัญ คุณภีรดลย์ยังมองว่าความสวยงามคือสิ่งที่ขาดไม่ได้เช่นกัน บริษัท โปรเซส อินเตอร์เนชั่นแนล จำกัด จึงถูกดีไซน์ให้มีความโปร่ง ทันสมัย รายละเอียดตั้งแต่ เสา คาน และหลังคาเรียบร้อย สวยสะอาดตาในโทนสีเทาดำ ซึ่งสะท้อนถึงภาพลักษณ์ของบริษัท สื่อสารเชื่อมโยงกับการเป็นผู้ผลิตด้านงานโลหการคุณภาพสูงที่เน้นเรื่องงานเชื่อมและสุขอนามัยในการผลิตระบบต่าง ๆ ซึ่งช่วยสร้างความเชื่อมั่นให้กับผู้ใช้งานได้ โครงสร้างเหล็กสำเร็จรูปจาก SYS คุยง่าย ปรึกษาได้ ให้งานเหล็กเร็ว คุณภาพดีในทุกสถานการณ์ ท้ายที่สุด คุณภีรดลย์สรุปและเล่าความประทับใจในการร่วมงานกับทีม SYS ว่าบริการโครงสร้างเหล็กสำเร็จรูปจาก SYS นั้นช่วยให้คำปรึกษาได้ดี ทั้งการดีไซน์และการแนะนำวัสดุอย่างเหล็ก H-BEAM เกรด SM520 ที่รับน้ำหนักได้ดีกว่า แข็งแรงกว่า ในขนาดหน้าตัดที่เล็กลงและราคาภาพรวมที่ลดลงประมาณ 20% ซึ่งในมุมมองของเจ้าของโครงการมองว่าราคาของเหล็ก H-BEAM เกรด SM520 นั้นไม่ได้ต่างจากเหล็ก H-BEAM เกรด SS400 มากนัก แต่การที่ได้คุณสมบัติด้านต่าง ๆ เพิ่มขึ้น ถือเป็นการลงทุนที่คุ้มค่าในระยะยาว

หลังจากคอนเฟิร์มแบบโครงสร้างร่วมกัน ทางทีม SYS ได้จัดเตรียมแบบ Shop Drawing และแปรรูปเหล็ก (Fabricate) พร้อมเข้าติดตั้งโครงสร้างเหล็กให้ที่หน้างานด้วยระบบ Bolt and Nut ที่แม่นยำตรงตามแบบ แทบไม่มีการตัดหรือแก้ไขชิ้นส่วนที่หน้างาน ทำให้ติดตั้งได้อย่างรวดเร็วง่ายดาย รอยต่อมีคุณภาพสวยงาม นอกจากนี้ยังเป็นระบบก่อสร้างแบบแห้ง (Dry Process) หน้างานจึงสะอาด ดูแลรักษาง่าย ช่วยให้สามารถทำงานส่วนอื่น ๆ อย่างผนัง Iso Wall ฟาซาดเมทัลชีท แผ่นหลังคาเป็นไปอย่างต่อเนื่องและรวดเร็วอีกด้วย ตลอดจนโครงสร้างสามารถรองรับการติดตั้ง Solar Cell ได้ในแผนถัดไป

A Modern, Column-Free Factory Built with SYS SM520 Steel for More Open Space and Greater Structural Strength The modern, column-free factory of Process International Co., Ltd. (formerly Pharma Process Technology Co., Ltd.) uses SYS SM520 steel to create a more open, airy interior and a stronger structure. The factory was designed and built to support the production of hygienic process piping and utility systems, piping installation, and a range of projects for the brewing industry. From the earliest stages of design, Managing Director and project owner Mr. Peeradol Thongthawai oversaw the project with equal attention to aesthetics and structural quality. The factory reflects forward planning, with a structure designed to safely carry the loads expected during operation and a choice of H-beam steel based on confidence in its performance. SYS supported the project with a team of professional engineers, steel products that comply with Thai Industrial Standards (TIS), and prefabricated steel structure services. Its team provided design advice, prepared and fabricated the steel, and completed the installation of the required steel structure. The Process International Co., Ltd. factory is an example of how a customer’s requirements for a modern, column-free factory can be brought to life through design and installation by SYS’s team of specialists. From Choosing H-Beam Steel to Building a Strong, Visually Appealing Steel Warehouse with SYS Process International Co., Ltd. (formerly Pharma Process Technology Co., Ltd.), owned by Mr. Peeradol Thongthawai, specializes in high-quality metalworking. The factory has an open steel structure with a 20-meter clear span and crane rails mounted to the steel frame. The building is divided into two sections. The first is a 9-meter-high factory and warehouse area equipped with a runway for a 5-ton crane. The second is a two-story office with a simple, modern box-shaped façade. The project began with the decision to use steel for the building’s structure. The client was confident that steel would make construction easier to manage and offer the strength and design flexibility needed to meet all of the building’s functional requirements. The client therefore turned to SYS to design and build the structure using H-beam SM520 and SYS’s prefabricated steel structure services. The project used a bolt-and-nut installation system that reduced the need for on-site welding. Each component was prefabricated with bolt locations and connection points already in place for assembly. SYS designed every component, specifying its height, width, and cross-sectional dimensions as well as the appropriate bolt sizes so the steel structure would fit the site precisely. The bolted connections also allowed for accurate assembly, while factory fabrication made it possible to control welding quality and achieve better welds than with on-site welding. The bolt-and-nut system played a key role in helping Process International build quickly, maintain construction quality, and complete the project in time to enter the market. SM520 Steel and Prefabricated Steel Structures from SYS Products and Services That Help Shape the Space You Need SYS SM520-grade H-beam steel and SYS’s prefabricated steel structure services played a central role in creating the space the project owner envisioned. The SYS team provided design advice and adapted the prefabricated steel structure to suit the architectural drawings. SYS engineers also advised on how the structural design could accommodate additional requirements, such as increasing the clear span or installing additional crane rails. หลังจากคอนเฟิร์มแบบโครงสร้างร่วมกัน ทางทีม SYS ได้จัดเตรียมแบบ Shop Drawing และแปรรูปเหล็ก (Fabricate) พร้อมเข้าติดตั้งโครงสร้างเหล็กให้ที่หน้างานด้วยระบบ Bolt and Nut ที่แม่นยำตรงตามแบบ แทบไม่มีการตัดหรือแก้ไขชิ้นส่วนที่หน้างาน ทำให้ติดตั้งได้อย่างรวดเร็วง่ายดาย รอยต่อมีคุณภาพสวยงาม นอกจากนี้ยังเป็นระบบก่อสร้างแบบแห้ง (Dry Process) หน้างานจึงสะอาด ดูแลรักษาง่าย ช่วยให้สามารถทำงานส่วนอื่น ๆ อย่างผนัง Iso Wall ฟาซาดเมทัลชีท แผ่นหลังคาเป็นไปอย่างต่อเนื่องและรวดเร็วอีกด้วย ตลอดจนโครงสร้างสามารถรองรับการติดตั้ง Solar Cell ได้ในแผนถัดไป “Good Design Must Go Hand in Hand with Functionality and Strength” to Best Meet the Project’s Needs Mr. Peeradol Thongthawai noted that many factories and warehouses try to cut costs by sourcing steel elsewhere, for example by welding steel plates together to form structural members. The lower upfront price can come with more underlying problems. The resulting structure can be thin, prone to flexing, and appear unstable. Process International Co., Ltd. chose SYS SM520 to achieve a thicker, stronger building structure that meets Thai Industrial Standards (TIS). The structure can withstand wind loads and forces that may arise during an earthquake, giving the project owner confidence in its long-term performance. Mr. Peeradol Thongthawai considers aesthetics just as essential as structural strength. The Process International Co., Ltd. factory was therefore designed to feel open and modern, with neatly finished columns, beams, and roofing in a clean palette of gray and black. This design reflects the company’s identity as a manufacturer specializing in high-quality metalwork, with an emphasis on welding quality and hygiene in the systems it produces. The building’s appearance helps inspire confidence among those who use these systems. Prefabricated Steel Structures from SYS An Approachable Team, Expert Advice, and Fast, High-Quality Steelwork in Any Situation Reflecting on his experience working with SYS, Mr. Peeradol Thongthawai said he was impressed by the advice the team provided through its prefabricated steel structure service, from structural design to material selection. SYS recommended SM520-grade H-beam steel, which offered greater strength and load-bearing capacity with smaller cross-sections. This helped reduce the overall cost by approximately 20%. In Mr. Peeradol’s view, SM520-grade and SS400-grade H-beam steel were close in price. He considered the added performance of SM520 a worthwhile long-term investment.

โรงงานยุคใหม่ กับดีไซน์โมเดิร์น ไร้เสากลาง ที่โปร่งโล่งและแกร่งกว่าเดิมด้วยเหล็ก SYS SM520 โรงงานยุคใหม่ ดีไซน์โมเดิร์น ไร้เสากลาง บริษัท โปรเซส อินเตอร์เนชั่นแนล จำกัด (ชื่อเดิม บริษัท ฟาร์ม่า โปรเซส เทคโนโลยี จำกัด) ถูกออกแบบและก่อสร้างเพื่อเป็นพื้นที่ผลิต Process Hygienic Piping, Utilities Systems, Piping Installation ตลอดจน Brewery Industry ต่าง ๆ ที่อยู่ภายใต้การดูแลของ “คุณภีรดลย์ ทองทะไว” ผู้เป็น Managing Director เเละเจ้าของโครงการที่ใส่ใจทั้งดีไซน์ที่สวยงามและคุณภาพของโครงสร้างควบคู่กันตั้งแต่ก้าวแรกของการออกแบบ โครงการนี้จึงไม่ใช่แค่สิ่งก่อสร้าง แต่คือผลลัพธ์ที่เกิดขึ้นจากการมองการณ์ไกลที่คิดเผื่อการรับน้ำหนักจากการใช้งานที่ปลอดภัยและมั่นใจศักยภาพของเหล็ก H-BEAM ที่มีทั้งทีมงานวิศวกรมืออาชีพ สินค้าเหล็กได้มาตรฐาน มอก. และบริการโครงสร้างเหล็กสำเร็จรูปจาก SYS ที่เข้ามาช่วยให้คำปรึกษาตั้งแต่ออกแบบ จัดเตรียม และแปรรูปเหล็ก พร้อมทั้งติดตั้งโครงสร้างเหล็กที่ต้องการให้เสร็จสรรพ บริษัท โปรเซส อินเตอร์เนชั่นแนล จำกัด จึงเป็นตัวอย่างของการก่อสร้าง โรงงานยุคใหม่ ดีไซน์โมเดิร์น ไร้เสากลาง ที่เกิดขึ้นจากความต้องการของลูกค้า และถูกก่อสร้างให้เป็นจริงผ่านการออกแบบติดตั้งจากทีมผู้เชี่ยวชาญของ SYS จากความตั้งใจเลือกใช้เหล็ก H-BEAM สู่โครงสร้างโกดังเหล็กที่สวยและแข็งแรงโดยทีมงาน SYS บริษัท โปรเซส อินเตอร์เนชั่นแนล จำกัด (ชื่อเดิม บริษัท ฟาร์ม่า โปรเซส  เทคโนโลยี จำกัด) เป็นบริษัทผู้เชี่ยวชาญด้านงานโลหการคุณภาพสูงของ “คุณภีรดลย์ ทองทะไว” โดยโรงงานมีลักษณะเป็นโครงสร้างเหล็ก โปร่งโล่ง Span กว้าง 20 ม. และมีการติดตั้งรางเครนไว้กับโครงสร้าง อาคาร 1 หลังแบ่งฟังก์ชันเป็น 2 ส่วน คือ โรงงานโกดังที่มีความสูง 9 ม. มีการติดตั้งรางเครนหนัก 5 ตัน และออฟฟิศ 2 ชั้นโดยดีไซน์ฟาซาดเป็นรูปทรงกล่อง ดูเรียบง่ายและทันสมัย จุดเริ่มต้นมาจากความต้องการใช้เหล็กเป็นโครงสร้างของอาคาร เพราะมั่นใจในการจัดการการก่อสร้าง ความแข็งแรง และดีไซน์ของเหล็กที่ตอบโจทย์การใช้งานได้ครบทุกด้าน จึงติดต่อทีมงาน SYS ในการออกแบบและดำเนินการผ่านการใช้เหล็ก H-BEAM เกรด SM520 และบริการโครงสร้างเหล็กสำเร็จรูปจาก SYS ลดการตัด – ต่อ – เชื่อม หน้างาน ลด Error เพิ่มความแม่นยำ – คำตอบของการก่อสร้างยุคใหม่ ในโครงการนี้มีการติดตั้งด้วยระบบติดตั้ง Bolt and Nut ซึ่งช่วยลดการเชื่อมที่หน้างาน เพราะชิ้นส่วนถูกวางตำแหน่งน็อตและจุดขันประกอบมาเรียบร้อยแล้ว โดยระหว่างขั้นตอน ทาง SYS ได้ช่วยดีไซน์ทุกชิ้นส่วน ตั้งแต่ความสูง ความกว้าง ขนาดหน้าตัด ตลอดจนรายละเอียดขนาดน็อตที่ใช้อย่างลงตัว ทำให้โครงสร้างเหล็กพอดีกับขนาดที่ดิน อีกทั้งระบบ Bolt and Nut ยังติดตั้งได้แม่นยำถูกต้อง และรอยเชื่อมมีคุณภาพมากกว่าการเชื่อมที่หน้างาน เพราะมีการ Fabricate เหล็กมาจากโรงงานทำให้สามารถควบคุมคุณภาพได้ เรียกได้ว่าการติดตั้งแบบ Bolt and Nut เป็นหัวใจสำคัญที่ทำให้ Process International ก่อสร้างได้รวดเร็ว คุณภาพดี จบงานได้ไว เพื่อให้พร้อมเข้าสู่ตลาดธุรกิจได้ทันท่วงที SM520 และโครงสร้างเหล็กสำเร็จรูปจาก SYS สินค้า – บริการที่ช่วยสร้าง Space ได้ตามต้องการ ทั้งเหล็ก SYS H-BEAM เกรด SM520 และบริการโครงสร้างเหล็กสำเร็จรูปจาก SYS ทำหน้าที่หลักในการสร้างสรรค์ Space ที่เจ้าของโครงการต้องการเกิดขึ้นได้จริง ด้วยการมีทีมงานของ SYS คอยให้คำปรึกษาเรื่องดีไซน์ มีโครงสร้างสำเร็จรูปที่สามารถประยุกต์จากแบบสถาปัตย์ และวิศวกรของ SYS ช่วยให้คำปรึกษาเรื่องแบบโครงสร้างให้เข้ากับความต้องการเพิ่มเติมได้ เช่น การขยาย Span ให้กว้างขึ้น หรือติดตั้งรางเครนเพิ่มเติม หลังจากคอนเฟิร์มแบบโครงสร้างร่วมกัน ทางทีม SYS ได้จัดเตรียมแบบ Shop Drawing และแปรรูปเหล็ก (Fabricate) พร้อมเข้าติดตั้งโครงสร้างเหล็กให้ที่หน้างานด้วยระบบ Bolt and Nut ที่แม่นยำตรงตามแบบ แทบไม่มีการตัดหรือแก้ไขชิ้นส่วนที่หน้างาน ทำให้ติดตั้งได้อย่างรวดเร็วง่ายดาย รอยต่อมีคุณภาพสวยงาม นอกจากนี้ยังเป็นระบบก่อสร้างแบบแห้ง (Dry Process) หน้างานจึงสะอาด ดูแลรักษาง่าย ช่วยให้สามารถทำงานส่วนอื่น ๆ อย่างผนัง Iso Wall ฟาซาดเมทัลชีท แผ่นหลังคาเป็นไปอย่างต่อเนื่องและรวดเร็วอีกด้วย ตลอดจนโครงสร้างสามารถรองรับการติดตั้ง Solar Cell ได้ในแผนถัดไป “ความสวยงามต้องไปพร้อมฟังก์ชันและความแข็งแรง” จึงจะตอบโจทย์ได้ดีที่สุด โดยคุณภีรดลย์ยังได้แลกเปลี่ยนว่า มีโรงงานและโกดังหลายแห่งต้องการประหยัดงบประมาณโดยเลือกใช้เหล็กจากแหล่งอื่น เช่น ใช้เหล็กแผ่นมาต่อเชื่อมเป็นโครงสร้าง ที่แม้ราคาสินค้าจะถูก แต่ปัญหาแฝงในภาพรวมนั้นมีมากกว่า อีกทั้งโครงสร้างที่ได้ยังมีความพลิ้ว บาง และดูไม่มั่นคง แต่สำหรับ บริษัท โปรเซส อินเตอร์เนชั่นแนล จำกัด ตัดสินใจเลือกใช้เหล็ก SYS เกรด SM520 ทำให้โครงสร้างอาคารมีความหนา แข็งแรงได้มาตรฐานตาม มอก. กำหนด จึงทนทานต่อแรงลมเเละแรงที่อาจเกิดขึ้นจากแผ่นดินไหวได้ หมดกังวลว่าจะเกิดปัญหาในอนาคต นอกจากด้านความแข็งแรงที่ต้องให้ความสำคัญ คุณภีรดลย์ยังมองว่าความสวยงามคือสิ่งที่ขาดไม่ได้เช่นกัน บริษัท โปรเซส อินเตอร์เนชั่นแนล จำกัด จึงถูกดีไซน์ให้มีความโปร่ง ทันสมัย รายละเอียดตั้งแต่ เสา คาน และหลังคาเรียบร้อย สวยสะอาดตาในโทนสีเทาดำ ซึ่งสะท้อนถึงภาพลักษณ์ของบริษัท สื่อสารเชื่อมโยงกับการเป็นผู้ผลิตด้านงานโลหการคุณภาพสูงที่เน้นเรื่องงานเชื่อมและสุขอนามัยในการผลิตระบบต่าง ๆ ซึ่งช่วยสร้างความเชื่อมั่นให้กับผู้ใช้งานได้ โครงสร้างเหล็กสำเร็จรูปจาก SYS คุยง่าย ปรึกษาได้ ให้งานเหล็กเร็ว คุณภาพดีในทุกสถานการณ์ ท้ายที่สุด คุณภีรดลย์สรุปและเล่าความประทับใจในการร่วมงานกับทีม SYS ว่าบริการโครงสร้างเหล็กสำเร็จรูปจาก SYS นั้นช่วยให้คำปรึกษาได้ดี ทั้งการดีไซน์และการแนะนำวัสดุอย่างเหล็ก H-BEAM เกรด SM520 ที่รับน้ำหนักได้ดีกว่า แข็งแรงกว่า ในขนาดหน้าตัดที่เล็กลงและราคาภาพรวมที่ลดลงประมาณ 20% ซึ่งในมุมมองของเจ้าของโครงการมองว่าราคาของเหล็ก H-BEAM เกรด SM520 นั้นไม่ได้ต่างจากเหล็ก H-BEAM เกรด SS400 มากนัก แต่การที่ได้คุณสมบัติด้านต่าง ๆ เพิ่มขึ้น ถือเป็นการลงทุนที่คุ้มค่าในระยะยาว

“Good Design Must Go Hand in Hand with Functionality and Strength” to Best Meet the Project’s Needs

Mr. Peeradol Thongthawai noted that many factories and warehouses try to cut costs by sourcing steel elsewhere, for example by welding steel plates together to form structural members. The lower upfront price can come with more underlying problems. The resulting structure can be thin, prone to flexing, and appear unstable.

Process International Co., Ltd. chose SYS SM520 to achieve a thicker, stronger building structure that meets Thai Industrial Standards (TIS). The structure can withstand wind loads and forces that may arise during an earthquake, giving the project owner confidence in its long-term performance.

A Modern, Column-Free Factory Built with SYS SM520 Steel for More Open Space and Greater Structural Strength The modern, column-free factory of Process International Co., Ltd. (formerly Pharma Process Technology Co., Ltd.) uses SYS SM520 steel to create a more open, airy interior and a stronger structure. The factory was designed and built to support the production of hygienic process piping and utility systems, piping installation, and a range of projects for the brewing industry. From the earliest stages of design, Managing Director and project owner Mr. Peeradol Thongthawai oversaw the project with equal attention to aesthetics and structural quality. The factory reflects forward planning, with a structure designed to safely carry the loads expected during operation and a choice of H-beam steel based on confidence in its performance. SYS supported the project with a team of professional engineers, steel products that comply with Thai Industrial Standards (TIS), and prefabricated steel structure services. Its team provided design advice, prepared and fabricated the steel, and completed the installation of the required steel structure. The Process International Co., Ltd. factory is an example of how a customer’s requirements for a modern, column-free factory can be brought to life through design and installation by SYS’s team of specialists. From Choosing H-Beam Steel to Building a Strong, Visually Appealing Steel Warehouse with SYS Process International Co., Ltd. (formerly Pharma Process Technology Co., Ltd.), owned by Mr. Peeradol Thongthawai, specializes in high-quality metalworking. The factory has an open steel structure with a 20-meter clear span and crane rails mounted to the steel frame. The building is divided into two sections. The first is a 9-meter-high factory and warehouse area equipped with a runway for a 5-ton crane. The second is a two-story office with a simple, modern box-shaped façade. The project began with the decision to use steel for the building’s structure. The client was confident that steel would make construction easier to manage and offer the strength and design flexibility needed to meet all of the building’s functional requirements. The client therefore turned to SYS to design and build the structure using H-beam SM520 and SYS’s prefabricated steel structure services. The project used a bolt-and-nut installation system that reduced the need for on-site welding. Each component was prefabricated with bolt locations and connection points already in place for assembly. SYS designed every component, specifying its height, width, and cross-sectional dimensions as well as the appropriate bolt sizes so the steel structure would fit the site precisely. The bolted connections also allowed for accurate assembly, while factory fabrication made it possible to control welding quality and achieve better welds than with on-site welding. The bolt-and-nut system played a key role in helping Process International build quickly, maintain construction quality, and complete the project in time to enter the market. SM520 Steel and Prefabricated Steel Structures from SYS Products and Services That Help Shape the Space You Need SYS SM520-grade H-beam steel and SYS’s prefabricated steel structure services played a central role in creating the space the project owner envisioned. The SYS team provided design advice and adapted the prefabricated steel structure to suit the architectural drawings. SYS engineers also advised on how the structural design could accommodate additional requirements, such as increasing the clear span or installing additional crane rails. หลังจากคอนเฟิร์มแบบโครงสร้างร่วมกัน ทางทีม SYS ได้จัดเตรียมแบบ Shop Drawing และแปรรูปเหล็ก (Fabricate) พร้อมเข้าติดตั้งโครงสร้างเหล็กให้ที่หน้างานด้วยระบบ Bolt and Nut ที่แม่นยำตรงตามแบบ แทบไม่มีการตัดหรือแก้ไขชิ้นส่วนที่หน้างาน ทำให้ติดตั้งได้อย่างรวดเร็วง่ายดาย รอยต่อมีคุณภาพสวยงาม นอกจากนี้ยังเป็นระบบก่อสร้างแบบแห้ง (Dry Process) หน้างานจึงสะอาด ดูแลรักษาง่าย ช่วยให้สามารถทำงานส่วนอื่น ๆ อย่างผนัง Iso Wall ฟาซาดเมทัลชีท แผ่นหลังคาเป็นไปอย่างต่อเนื่องและรวดเร็วอีกด้วย ตลอดจนโครงสร้างสามารถรองรับการติดตั้ง Solar Cell ได้ในแผนถัดไป “Good Design Must Go Hand in Hand with Functionality and Strength” to Best Meet the Project’s Needs Mr. Peeradol Thongthawai noted that many factories and warehouses try to cut costs by sourcing steel elsewhere, for example by welding steel plates together to form structural members. The lower upfront price can come with more underlying problems. The resulting structure can be thin, prone to flexing, and appear unstable. Process International Co., Ltd. chose SYS SM520 to achieve a thicker, stronger building structure that meets Thai Industrial Standards (TIS). The structure can withstand wind loads and forces that may arise during an earthquake, giving the project owner confidence in its long-term performance. Mr. Peeradol Thongthawai considers aesthetics just as essential as structural strength. The Process International Co., Ltd. factory was therefore designed to feel open and modern, with neatly finished columns, beams, and roofing in a clean palette of gray and black. This design reflects the company’s identity as a manufacturer specializing in high-quality metalwork, with an emphasis on welding quality and hygiene in the systems it produces. The building’s appearance helps inspire confidence among those who use these systems. Prefabricated Steel Structures from SYS An Approachable Team, Expert Advice, and Fast, High-Quality Steelwork in Any Situation Reflecting on his experience working with SYS, Mr. Peeradol Thongthawai said he was impressed by the advice the team provided through its prefabricated steel structure service, from structural design to material selection. SYS recommended SM520-grade H-beam steel, which offered greater strength and load-bearing capacity with smaller cross-sections. This helped reduce the overall cost by approximately 20%. In Mr. Peeradol’s view, SM520-grade and SS400-grade H-beam steel were close in price. He considered the added performance of SM520 a worthwhile long-term investment.

A Modern, Column-Free Factory Built with SYS SM520 Steel for More Open Space and Greater Structural Strength The modern, column-free factory of Process International Co., Ltd. (formerly Pharma Process Technology Co., Ltd.) uses SYS SM520 steel to create a more open, airy interior and a stronger structure. The factory was designed and built to support the production of hygienic process piping and utility systems, piping installation, and a range of projects for the brewing industry. From the earliest stages of design, Managing Director and project owner Mr. Peeradol Thongthawai oversaw the project with equal attention to aesthetics and structural quality. The factory reflects forward planning, with a structure designed to safely carry the loads expected during operation and a choice of H-beam steel based on confidence in its performance. SYS supported the project with a team of professional engineers, steel products that comply with Thai Industrial Standards (TIS), and prefabricated steel structure services. Its team provided design advice, prepared and fabricated the steel, and completed the installation of the required steel structure. The Process International Co., Ltd. factory is an example of how a customer’s requirements for a modern, column-free factory can be brought to life through design and installation by SYS’s team of specialists. From Choosing H-Beam Steel to Building a Strong, Visually Appealing Steel Warehouse with SYS Process International Co., Ltd. (formerly Pharma Process Technology Co., Ltd.), owned by Mr. Peeradol Thongthawai, specializes in high-quality metalworking. The factory has an open steel structure with a 20-meter clear span and crane rails mounted to the steel frame. The building is divided into two sections. The first is a 9-meter-high factory and warehouse area equipped with a runway for a 5-ton crane. The second is a two-story office with a simple, modern box-shaped façade. The project began with the decision to use steel for the building’s structure. The client was confident that steel would make construction easier to manage and offer the strength and design flexibility needed to meet all of the building’s functional requirements. The client therefore turned to SYS to design and build the structure using H-beam SM520 and SYS’s prefabricated steel structure services. The project used a bolt-and-nut installation system that reduced the need for on-site welding. Each component was prefabricated with bolt locations and connection points already in place for assembly. SYS designed every component, specifying its height, width, and cross-sectional dimensions as well as the appropriate bolt sizes so the steel structure would fit the site precisely. The bolted connections also allowed for accurate assembly, while factory fabrication made it possible to control welding quality and achieve better welds than with on-site welding. The bolt-and-nut system played a key role in helping Process International build quickly, maintain construction quality, and complete the project in time to enter the market. SM520 Steel and Prefabricated Steel Structures from SYS Products and Services That Help Shape the Space You Need SYS SM520-grade H-beam steel and SYS’s prefabricated steel structure services played a central role in creating the space the project owner envisioned. The SYS team provided design advice and adapted the prefabricated steel structure to suit the architectural drawings. SYS engineers also advised on how the structural design could accommodate additional requirements, such as increasing the clear span or installing additional crane rails. หลังจากคอนเฟิร์มแบบโครงสร้างร่วมกัน ทางทีม SYS ได้จัดเตรียมแบบ Shop Drawing และแปรรูปเหล็ก (Fabricate) พร้อมเข้าติดตั้งโครงสร้างเหล็กให้ที่หน้างานด้วยระบบ Bolt and Nut ที่แม่นยำตรงตามแบบ แทบไม่มีการตัดหรือแก้ไขชิ้นส่วนที่หน้างาน ทำให้ติดตั้งได้อย่างรวดเร็วง่ายดาย รอยต่อมีคุณภาพสวยงาม นอกจากนี้ยังเป็นระบบก่อสร้างแบบแห้ง (Dry Process) หน้างานจึงสะอาด ดูแลรักษาง่าย ช่วยให้สามารถทำงานส่วนอื่น ๆ อย่างผนัง Iso Wall ฟาซาดเมทัลชีท แผ่นหลังคาเป็นไปอย่างต่อเนื่องและรวดเร็วอีกด้วย ตลอดจนโครงสร้างสามารถรองรับการติดตั้ง Solar Cell ได้ในแผนถัดไป “Good Design Must Go Hand in Hand with Functionality and Strength” to Best Meet the Project’s Needs Mr. Peeradol Thongthawai noted that many factories and warehouses try to cut costs by sourcing steel elsewhere, for example by welding steel plates together to form structural members. The lower upfront price can come with more underlying problems. The resulting structure can be thin, prone to flexing, and appear unstable. Process International Co., Ltd. chose SYS SM520 to achieve a thicker, stronger building structure that meets Thai Industrial Standards (TIS). The structure can withstand wind loads and forces that may arise during an earthquake, giving the project owner confidence in its long-term performance. Mr. Peeradol Thongthawai considers aesthetics just as essential as structural strength. The Process International Co., Ltd. factory was therefore designed to feel open and modern, with neatly finished columns, beams, and roofing in a clean palette of gray and black. This design reflects the company’s identity as a manufacturer specializing in high-quality metalwork, with an emphasis on welding quality and hygiene in the systems it produces. The building’s appearance helps inspire confidence among those who use these systems. Prefabricated Steel Structures from SYS An Approachable Team, Expert Advice, and Fast, High-Quality Steelwork in Any Situation Reflecting on his experience working with SYS, Mr. Peeradol Thongthawai said he was impressed by the advice the team provided through its prefabricated steel structure service, from structural design to material selection. SYS recommended SM520-grade H-beam steel, which offered greater strength and load-bearing capacity with smaller cross-sections. This helped reduce the overall cost by approximately 20%. In Mr. Peeradol’s view, SM520-grade and SS400-grade H-beam steel were close in price. He considered the added performance of SM520 a worthwhile long-term investment.

Mr. Peeradol Thongthawai considers aesthetics just as essential as structural strength. The Process International Co., Ltd. factory was therefore designed to feel open and modern, with neatly finished columns, beams, and roofing in a clean palette of gray and black. This design reflects the company’s identity as a manufacturer specializing in high-quality metalwork, with an emphasis on welding quality and hygiene in the systems it produces. The building’s appearance helps inspire confidence among those who use these systems.

Prefabricated Steel Structures from SYS

An Approachable Team, Expert Advice, and Fast, High-Quality Steelwork in Any Situation

Reflecting on his experience working with SYS, Mr. Peeradol Thongthawai said he was impressed by the advice the team provided through its prefabricated steel structure service, from structural design to material selection. SYS recommended SM520-grade H-beam steel, which offered greater strength and load-bearing capacity with smaller cross-sections. This helped reduce the overall cost by approximately 20%.

In Mr. Peeradol’s view, SM520-grade and SS400-grade H-beam steel were close in price. He considered the added performance of SM520 a worthwhile long-term investment.

โรงงานยุคใหม่ กับดีไซน์โมเดิร์น ไร้เสากลาง ที่โปร่งโล่งและแกร่งกว่าเดิมด้วยเหล็ก SYS SM520 โรงงานยุคใหม่ ดีไซน์โมเดิร์น ไร้เสากลาง บริษัท โปรเซส อินเตอร์เนชั่นแนล จำกัด (ชื่อเดิม บริษัท ฟาร์ม่า โปรเซส เทคโนโลยี จำกัด) ถูกออกแบบและก่อสร้างเพื่อเป็นพื้นที่ผลิต Process Hygienic Piping, Utilities Systems, Piping Installation ตลอดจน Brewery Industry ต่าง ๆ ที่อยู่ภายใต้การดูแลของ “คุณภีรดลย์ ทองทะไว” ผู้เป็น Managing Director เเละเจ้าของโครงการที่ใส่ใจทั้งดีไซน์ที่สวยงามและคุณภาพของโครงสร้างควบคู่กันตั้งแต่ก้าวแรกของการออกแบบ โครงการนี้จึงไม่ใช่แค่สิ่งก่อสร้าง แต่คือผลลัพธ์ที่เกิดขึ้นจากการมองการณ์ไกลที่คิดเผื่อการรับน้ำหนักจากการใช้งานที่ปลอดภัยและมั่นใจศักยภาพของเหล็ก H-BEAM ที่มีทั้งทีมงานวิศวกรมืออาชีพ สินค้าเหล็กได้มาตรฐาน มอก. และบริการโครงสร้างเหล็กสำเร็จรูปจาก SYS ที่เข้ามาช่วยให้คำปรึกษาตั้งแต่ออกแบบ จัดเตรียม และแปรรูปเหล็ก พร้อมทั้งติดตั้งโครงสร้างเหล็กที่ต้องการให้เสร็จสรรพ บริษัท โปรเซส อินเตอร์เนชั่นแนล จำกัด จึงเป็นตัวอย่างของการก่อสร้าง โรงงานยุคใหม่ ดีไซน์โมเดิร์น ไร้เสากลาง ที่เกิดขึ้นจากความต้องการของลูกค้า และถูกก่อสร้างให้เป็นจริงผ่านการออกแบบติดตั้งจากทีมผู้เชี่ยวชาญของ SYS จากความตั้งใจเลือกใช้เหล็ก H-BEAM สู่โครงสร้างโกดังเหล็กที่สวยและแข็งแรงโดยทีมงาน SYS บริษัท โปรเซส อินเตอร์เนชั่นแนล จำกัด (ชื่อเดิม บริษัท ฟาร์ม่า โปรเซส  เทคโนโลยี จำกัด) เป็นบริษัทผู้เชี่ยวชาญด้านงานโลหการคุณภาพสูงของ “คุณภีรดลย์ ทองทะไว” โดยโรงงานมีลักษณะเป็นโครงสร้างเหล็ก โปร่งโล่ง Span กว้าง 20 ม. และมีการติดตั้งรางเครนไว้กับโครงสร้าง อาคาร 1 หลังแบ่งฟังก์ชันเป็น 2 ส่วน คือ โรงงานโกดังที่มีความสูง 9 ม. มีการติดตั้งรางเครนหนัก 5 ตัน และออฟฟิศ 2 ชั้นโดยดีไซน์ฟาซาดเป็นรูปทรงกล่อง ดูเรียบง่ายและทันสมัย จุดเริ่มต้นมาจากความต้องการใช้เหล็กเป็นโครงสร้างของอาคาร เพราะมั่นใจในการจัดการการก่อสร้าง ความแข็งแรง และดีไซน์ของเหล็กที่ตอบโจทย์การใช้งานได้ครบทุกด้าน จึงติดต่อทีมงาน SYS ในการออกแบบและดำเนินการผ่านการใช้เหล็ก H-BEAM เกรด SM520 และบริการโครงสร้างเหล็กสำเร็จรูปจาก SYS ลดการตัด – ต่อ – เชื่อม หน้างาน ลด Error เพิ่มความแม่นยำ – คำตอบของการก่อสร้างยุคใหม่ ในโครงการนี้มีการติดตั้งด้วยระบบติดตั้ง Bolt and Nut ซึ่งช่วยลดการเชื่อมที่หน้างาน เพราะชิ้นส่วนถูกวางตำแหน่งน็อตและจุดขันประกอบมาเรียบร้อยแล้ว โดยระหว่างขั้นตอน ทาง SYS ได้ช่วยดีไซน์ทุกชิ้นส่วน ตั้งแต่ความสูง ความกว้าง ขนาดหน้าตัด ตลอดจนรายละเอียดขนาดน็อตที่ใช้อย่างลงตัว ทำให้โครงสร้างเหล็กพอดีกับขนาดที่ดิน อีกทั้งระบบ Bolt and Nut ยังติดตั้งได้แม่นยำถูกต้อง และรอยเชื่อมมีคุณภาพมากกว่าการเชื่อมที่หน้างาน เพราะมีการ Fabricate เหล็กมาจากโรงงานทำให้สามารถควบคุมคุณภาพได้ เรียกได้ว่าการติดตั้งแบบ Bolt and Nut เป็นหัวใจสำคัญที่ทำให้ Process International ก่อสร้างได้รวดเร็ว คุณภาพดี จบงานได้ไว เพื่อให้พร้อมเข้าสู่ตลาดธุรกิจได้ทันท่วงที SM520 และโครงสร้างเหล็กสำเร็จรูปจาก SYS สินค้า – บริการที่ช่วยสร้าง Space ได้ตามต้องการ ทั้งเหล็ก SYS H-BEAM เกรด SM520 และบริการโครงสร้างเหล็กสำเร็จรูปจาก SYS ทำหน้าที่หลักในการสร้างสรรค์ Space ที่เจ้าของโครงการต้องการเกิดขึ้นได้จริง ด้วยการมีทีมงานของ SYS คอยให้คำปรึกษาเรื่องดีไซน์ มีโครงสร้างสำเร็จรูปที่สามารถประยุกต์จากแบบสถาปัตย์ และวิศวกรของ SYS ช่วยให้คำปรึกษาเรื่องแบบโครงสร้างให้เข้ากับความต้องการเพิ่มเติมได้ เช่น การขยาย Span ให้กว้างขึ้น หรือติดตั้งรางเครนเพิ่มเติม หลังจากคอนเฟิร์มแบบโครงสร้างร่วมกัน ทางทีม SYS ได้จัดเตรียมแบบ Shop Drawing และแปรรูปเหล็ก (Fabricate) พร้อมเข้าติดตั้งโครงสร้างเหล็กให้ที่หน้างานด้วยระบบ Bolt and Nut ที่แม่นยำตรงตามแบบ แทบไม่มีการตัดหรือแก้ไขชิ้นส่วนที่หน้างาน ทำให้ติดตั้งได้อย่างรวดเร็วง่ายดาย รอยต่อมีคุณภาพสวยงาม นอกจากนี้ยังเป็นระบบก่อสร้างแบบแห้ง (Dry Process) หน้างานจึงสะอาด ดูแลรักษาง่าย ช่วยให้สามารถทำงานส่วนอื่น ๆ อย่างผนัง Iso Wall ฟาซาดเมทัลชีท แผ่นหลังคาเป็นไปอย่างต่อเนื่องและรวดเร็วอีกด้วย ตลอดจนโครงสร้างสามารถรองรับการติดตั้ง Solar Cell ได้ในแผนถัดไป “ความสวยงามต้องไปพร้อมฟังก์ชันและความแข็งแรง” จึงจะตอบโจทย์ได้ดีที่สุด โดยคุณภีรดลย์ยังได้แลกเปลี่ยนว่า มีโรงงานและโกดังหลายแห่งต้องการประหยัดงบประมาณโดยเลือกใช้เหล็กจากแหล่งอื่น เช่น ใช้เหล็กแผ่นมาต่อเชื่อมเป็นโครงสร้าง ที่แม้ราคาสินค้าจะถูก แต่ปัญหาแฝงในภาพรวมนั้นมีมากกว่า อีกทั้งโครงสร้างที่ได้ยังมีความพลิ้ว บาง และดูไม่มั่นคง แต่สำหรับ บริษัท โปรเซส อินเตอร์เนชั่นแนล จำกัด ตัดสินใจเลือกใช้เหล็ก SYS เกรด SM520 ทำให้โครงสร้างอาคารมีความหนา แข็งแรงได้มาตรฐานตาม มอก. กำหนด จึงทนทานต่อแรงลมเเละแรงที่อาจเกิดขึ้นจากแผ่นดินไหวได้ หมดกังวลว่าจะเกิดปัญหาในอนาคต นอกจากด้านความแข็งแรงที่ต้องให้ความสำคัญ คุณภีรดลย์ยังมองว่าความสวยงามคือสิ่งที่ขาดไม่ได้เช่นกัน บริษัท โปรเซส อินเตอร์เนชั่นแนล จำกัด จึงถูกดีไซน์ให้มีความโปร่ง ทันสมัย รายละเอียดตั้งแต่ เสา คาน และหลังคาเรียบร้อย สวยสะอาดตาในโทนสีเทาดำ ซึ่งสะท้อนถึงภาพลักษณ์ของบริษัท สื่อสารเชื่อมโยงกับการเป็นผู้ผลิตด้านงานโลหการคุณภาพสูงที่เน้นเรื่องงานเชื่อมและสุขอนามัยในการผลิตระบบต่าง ๆ ซึ่งช่วยสร้างความเชื่อมั่นให้กับผู้ใช้งานได้ โครงสร้างเหล็กสำเร็จรูปจาก SYS คุยง่าย ปรึกษาได้ ให้งานเหล็กเร็ว คุณภาพดีในทุกสถานการณ์ ท้ายที่สุด คุณภีรดลย์สรุปและเล่าความประทับใจในการร่วมงานกับทีม SYS ว่าบริการโครงสร้างเหล็กสำเร็จรูปจาก SYS นั้นช่วยให้คำปรึกษาได้ดี ทั้งการดีไซน์และการแนะนำวัสดุอย่างเหล็ก H-BEAM เกรด SM520 ที่รับน้ำหนักได้ดีกว่า แข็งแรงกว่า ในขนาดหน้าตัดที่เล็กลงและราคาภาพรวมที่ลดลงประมาณ 20% ซึ่งในมุมมองของเจ้าของโครงการมองว่าราคาของเหล็ก H-BEAM เกรด SM520 นั้นไม่ได้ต่างจากเหล็ก H-BEAM เกรด SS400 มากนัก แต่การที่ได้คุณสมบัติด้านต่าง ๆ เพิ่มขึ้น ถือเป็นการลงทุนที่คุ้มค่าในระยะยาว

โรงงานยุคใหม่ กับดีไซน์โมเดิร์น ไร้เสากลาง ที่โปร่งโล่งและแกร่งกว่าเดิมด้วยเหล็ก SYS SM520 โรงงานยุคใหม่ ดีไซน์โมเดิร์น ไร้เสากลาง บริษัท โปรเซส อินเตอร์เนชั่นแนล จำกัด (ชื่อเดิม บริษัท ฟาร์ม่า โปรเซส เทคโนโลยี จำกัด) ถูกออกแบบและก่อสร้างเพื่อเป็นพื้นที่ผลิต Process Hygienic Piping, Utilities Systems, Piping Installation ตลอดจน Brewery Industry ต่าง ๆ ที่อยู่ภายใต้การดูแลของ “คุณภีรดลย์ ทองทะไว” ผู้เป็น Managing Director เเละเจ้าของโครงการที่ใส่ใจทั้งดีไซน์ที่สวยงามและคุณภาพของโครงสร้างควบคู่กันตั้งแต่ก้าวแรกของการออกแบบ โครงการนี้จึงไม่ใช่แค่สิ่งก่อสร้าง แต่คือผลลัพธ์ที่เกิดขึ้นจากการมองการณ์ไกลที่คิดเผื่อการรับน้ำหนักจากการใช้งานที่ปลอดภัยและมั่นใจศักยภาพของเหล็ก H-BEAM ที่มีทั้งทีมงานวิศวกรมืออาชีพ สินค้าเหล็กได้มาตรฐาน มอก. และบริการโครงสร้างเหล็กสำเร็จรูปจาก SYS ที่เข้ามาช่วยให้คำปรึกษาตั้งแต่ออกแบบ จัดเตรียม และแปรรูปเหล็ก พร้อมทั้งติดตั้งโครงสร้างเหล็กที่ต้องการให้เสร็จสรรพ บริษัท โปรเซส อินเตอร์เนชั่นแนล จำกัด จึงเป็นตัวอย่างของการก่อสร้าง โรงงานยุคใหม่ ดีไซน์โมเดิร์น ไร้เสากลาง ที่เกิดขึ้นจากความต้องการของลูกค้า และถูกก่อสร้างให้เป็นจริงผ่านการออกแบบติดตั้งจากทีมผู้เชี่ยวชาญของ SYS จากความตั้งใจเลือกใช้เหล็ก H-BEAM สู่โครงสร้างโกดังเหล็กที่สวยและแข็งแรงโดยทีมงาน SYS บริษัท โปรเซส อินเตอร์เนชั่นแนล จำกัด (ชื่อเดิม บริษัท ฟาร์ม่า โปรเซส  เทคโนโลยี จำกัด) เป็นบริษัทผู้เชี่ยวชาญด้านงานโลหการคุณภาพสูงของ “คุณภีรดลย์ ทองทะไว” โดยโรงงานมีลักษณะเป็นโครงสร้างเหล็ก โปร่งโล่ง Span กว้าง 20 ม. และมีการติดตั้งรางเครนไว้กับโครงสร้าง อาคาร 1 หลังแบ่งฟังก์ชันเป็น 2 ส่วน คือ โรงงานโกดังที่มีความสูง 9 ม. มีการติดตั้งรางเครนหนัก 5 ตัน และออฟฟิศ 2 ชั้นโดยดีไซน์ฟาซาดเป็นรูปทรงกล่อง ดูเรียบง่ายและทันสมัย จุดเริ่มต้นมาจากความต้องการใช้เหล็กเป็นโครงสร้างของอาคาร เพราะมั่นใจในการจัดการการก่อสร้าง ความแข็งแรง และดีไซน์ของเหล็กที่ตอบโจทย์การใช้งานได้ครบทุกด้าน จึงติดต่อทีมงาน SYS ในการออกแบบและดำเนินการผ่านการใช้เหล็ก H-BEAM เกรด SM520 และบริการโครงสร้างเหล็กสำเร็จรูปจาก SYS ลดการตัด – ต่อ – เชื่อม หน้างาน ลด Error เพิ่มความแม่นยำ – คำตอบของการก่อสร้างยุคใหม่ ในโครงการนี้มีการติดตั้งด้วยระบบติดตั้ง Bolt and Nut ซึ่งช่วยลดการเชื่อมที่หน้างาน เพราะชิ้นส่วนถูกวางตำแหน่งน็อตและจุดขันประกอบมาเรียบร้อยแล้ว โดยระหว่างขั้นตอน ทาง SYS ได้ช่วยดีไซน์ทุกชิ้นส่วน ตั้งแต่ความสูง ความกว้าง ขนาดหน้าตัด ตลอดจนรายละเอียดขนาดน็อตที่ใช้อย่างลงตัว ทำให้โครงสร้างเหล็กพอดีกับขนาดที่ดิน อีกทั้งระบบ Bolt and Nut ยังติดตั้งได้แม่นยำถูกต้อง และรอยเชื่อมมีคุณภาพมากกว่าการเชื่อมที่หน้างาน เพราะมีการ Fabricate เหล็กมาจากโรงงานทำให้สามารถควบคุมคุณภาพได้ เรียกได้ว่าการติดตั้งแบบ Bolt and Nut เป็นหัวใจสำคัญที่ทำให้ Process International ก่อสร้างได้รวดเร็ว คุณภาพดี จบงานได้ไว เพื่อให้พร้อมเข้าสู่ตลาดธุรกิจได้ทันท่วงที SM520 และโครงสร้างเหล็กสำเร็จรูปจาก SYS สินค้า – บริการที่ช่วยสร้าง Space ได้ตามต้องการ ทั้งเหล็ก SYS H-BEAM เกรด SM520 และบริการโครงสร้างเหล็กสำเร็จรูปจาก SYS ทำหน้าที่หลักในการสร้างสรรค์ Space ที่เจ้าของโครงการต้องการเกิดขึ้นได้จริง ด้วยการมีทีมงานของ SYS คอยให้คำปรึกษาเรื่องดีไซน์ มีโครงสร้างสำเร็จรูปที่สามารถประยุกต์จากแบบสถาปัตย์ และวิศวกรของ SYS ช่วยให้คำปรึกษาเรื่องแบบโครงสร้างให้เข้ากับความต้องการเพิ่มเติมได้ เช่น การขยาย Span ให้กว้างขึ้น หรือติดตั้งรางเครนเพิ่มเติม หลังจากคอนเฟิร์มแบบโครงสร้างร่วมกัน ทางทีม SYS ได้จัดเตรียมแบบ Shop Drawing และแปรรูปเหล็ก (Fabricate) พร้อมเข้าติดตั้งโครงสร้างเหล็กให้ที่หน้างานด้วยระบบ Bolt and Nut ที่แม่นยำตรงตามแบบ แทบไม่มีการตัดหรือแก้ไขชิ้นส่วนที่หน้างาน ทำให้ติดตั้งได้อย่างรวดเร็วง่ายดาย รอยต่อมีคุณภาพสวยงาม นอกจากนี้ยังเป็นระบบก่อสร้างแบบแห้ง (Dry Process) หน้างานจึงสะอาด ดูแลรักษาง่าย ช่วยให้สามารถทำงานส่วนอื่น ๆ อย่างผนัง Iso Wall ฟาซาดเมทัลชีท แผ่นหลังคาเป็นไปอย่างต่อเนื่องและรวดเร็วอีกด้วย ตลอดจนโครงสร้างสามารถรองรับการติดตั้ง Solar Cell ได้ในแผนถัดไป “ความสวยงามต้องไปพร้อมฟังก์ชันและความแข็งแรง” จึงจะตอบโจทย์ได้ดีที่สุด โดยคุณภีรดลย์ยังได้แลกเปลี่ยนว่า มีโรงงานและโกดังหลายแห่งต้องการประหยัดงบประมาณโดยเลือกใช้เหล็กจากแหล่งอื่น เช่น ใช้เหล็กแผ่นมาต่อเชื่อมเป็นโครงสร้าง ที่แม้ราคาสินค้าจะถูก แต่ปัญหาแฝงในภาพรวมนั้นมีมากกว่า อีกทั้งโครงสร้างที่ได้ยังมีความพลิ้ว บาง และดูไม่มั่นคง แต่สำหรับ บริษัท โปรเซส อินเตอร์เนชั่นแนล จำกัด ตัดสินใจเลือกใช้เหล็ก SYS เกรด SM520 ทำให้โครงสร้างอาคารมีความหนา แข็งแรงได้มาตรฐานตาม มอก. กำหนด จึงทนทานต่อแรงลมเเละแรงที่อาจเกิดขึ้นจากแผ่นดินไหวได้ หมดกังวลว่าจะเกิดปัญหาในอนาคต นอกจากด้านความแข็งแรงที่ต้องให้ความสำคัญ คุณภีรดลย์ยังมองว่าความสวยงามคือสิ่งที่ขาดไม่ได้เช่นกัน บริษัท โปรเซส อินเตอร์เนชั่นแนล จำกัด จึงถูกดีไซน์ให้มีความโปร่ง ทันสมัย รายละเอียดตั้งแต่ เสา คาน และหลังคาเรียบร้อย สวยสะอาดตาในโทนสีเทาดำ ซึ่งสะท้อนถึงภาพลักษณ์ของบริษัท สื่อสารเชื่อมโยงกับการเป็นผู้ผลิตด้านงานโลหการคุณภาพสูงที่เน้นเรื่องงานเชื่อมและสุขอนามัยในการผลิตระบบต่าง ๆ ซึ่งช่วยสร้างความเชื่อมั่นให้กับผู้ใช้งานได้ โครงสร้างเหล็กสำเร็จรูปจาก SYS คุยง่าย ปรึกษาได้ ให้งานเหล็กเร็ว คุณภาพดีในทุกสถานการณ์ ท้ายที่สุด คุณภีรดลย์สรุปและเล่าความประทับใจในการร่วมงานกับทีม SYS ว่าบริการโครงสร้างเหล็กสำเร็จรูปจาก SYS นั้นช่วยให้คำปรึกษาได้ดี ทั้งการดีไซน์และการแนะนำวัสดุอย่างเหล็ก H-BEAM เกรด SM520 ที่รับน้ำหนักได้ดีกว่า แข็งแรงกว่า ในขนาดหน้าตัดที่เล็กลงและราคาภาพรวมที่ลดลงประมาณ 20% ซึ่งในมุมมองของเจ้าของโครงการมองว่าราคาของเหล็ก H-BEAM เกรด SM520 นั้นไม่ได้ต่างจากเหล็ก H-BEAM เกรด SS400 มากนัก แต่การที่ได้คุณสมบัติด้านต่าง ๆ เพิ่มขึ้น ถือเป็นการลงทุนที่คุ้มค่าในระยะยาว

WEBSITE-SYS STEEL: https://bit.ly/3qYADQ0

YOUTUBE: http://bit.ly/3asNqnp

LINE: https://bit.ly/3gEI0tz

TikTok: https://bit.ly/46AnaTP