Astra Communication’s Office

Owner : Ms. Chantaporn Charoenlapnopparat

Architect :  Ms. Duanwarin Pingmuang

Engineer :  Mr. Panit Supasiriluck (Performax building service)

Project : Astra Communication Service Co., Ltd., a leading domestic broadband market provider of communication equipment and the Internet. It is located in Phahonyothin 11 Alley. It is a 4-story office building with an area of 2,400 sq m.

Design to Services : With the vision of the management wanting to have a pleasant workplace, the functionality is divided into the ground floor building as a car park, the warehouse on the 2nd floor and the workspace of the employees on different floors. The building must have extra-wide columns, not bulky and must be airy. The SM520 steel is a complete design solution. During the construction, there were still limitations of the location: no pollution, limited storage space for building materials, and narrow transportation paths. But the service from Steel Solution solved these problems smoothly.

Steel Solution Services : The engineering team from Steel Solution by SYS recommends and provides advice on steel structures, steel fabrication services in factories with high standards. SYS is ready to install steel at the job site immediately with the “Bolted Connection” system. This steel structure building could be installed in 45 days.